Laserfiche WebLink
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 120784.00 <br />Work Order Title: City of Sunny Isles Beach - Piers Park Drainage Repairs <br />1. General Conditions <br />11 01 71 13 00 0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor <br />01 22 23 00 0547 <br />$6,560.37 <br />Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of <br />equipment, off loading on site, rigging, dismantling, loading for return and <br />transporting away. For equipment such as bulldozers, motor scrapers, <br />Quantity Unit Price <br />hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty <br />Total <br />construction loaders, tractors, pavers, rollers, bridge finishers, straight mast <br />construction forklifts, telescoping boom rough terrain construction forklifts, <br />x <br />1.1294 <br />telescoping and articulating boom man lifts with >40' boom lengths, etc. <br />14 <br />Quantity Unit Price Factor <br />Total <br />CYM Hauling On Paved Roads, First 15 Miles <br />Installation 4.00 x 1,452.18 x 1.1294 <br />6,560.37 <br />Subtotal for 1. General Conditions <br />$18,617.22 <br />2. Drainage <br />Quantity Unit Price <br />12 01 22 23 00 0497 MO 4'x 8' Trench Box With Up To 48" Spreaders <br />Total <br />$1,355.89 <br />Quantity Unit Price Factor <br />Total <br />Installation 2.00 x 600.27 x 1.1294 <br />1,355.89 <br />1.1294 <br />13 <br />01 22 23 00 0547 <br />MO 8'x 8' Manhole Box <br />$1,34592 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 1.00 x 1,191.71 <br />x <br />1.1294 <br />1,345.92 <br />14 <br />01 74 <br />19 00 0037 <br />CYM Hauling On Paved Roads, First 15 Miles <br />$167.21 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 157.50 x 0.94 <br />x <br />1.1294 <br />167.21 <br />15 <br />01 74 <br />19 00 0037 <br />CYM Hauling On Paved Roads, First 15 Miles <br />$796.23 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 750.00 x 0.94 <br />x <br />1.1294 <br />796.23 <br />16 <br />31 05 <br />16 00 0008 <br />CY #57 Stone Aggregate Fill (3/8" To 1") <br />$2,953.16 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 40.00 x 65.37 <br />x <br />1.1294 <br />2,953.16 <br />17 <br />31 05 <br />16 00 0008 <br />CY #57 Stone Aggregate Fill (3/8" To 1") <br />$369.14 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 5.00 x 65.37 <br />x <br />1.1294 <br />369.14 <br />18 <br />31 05 <br />16 00 0008 0053 <br />MOD For Up To 8, Add <br />$73.81 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 5.00 x 13.07 <br />x <br />1.1294 <br />73.81 <br />19 <br />31 23 <br />16 13 0004 <br />CY 12" Wide or Less, Excavation for Trenching by Machine in Loose Rockincludes <br />$1,244.60 <br />compacted aggregate <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 95.00 x 11.60 <br />x <br />1.1294 <br />1,244.60 <br />20 <br />31 23 <br />16 13 0004 0062 <br />MOD For >50 To 250, Add <br />$311.15 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 95.00 x 2.90 <br />x <br />1.1294 <br />311.15 <br />21 <br />31 23 <br />16 13 0010 <br />CY Backfilling or Placing Subbase for Trenches with Imported <br />or Stockpiled <br />$257.50 <br />Materials by Machine <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 95.00 x 2.40 <br />x <br />1.1294 <br />257.50 <br />22 <br />31 23 <br />16 13 0010 0067 <br />MOD For >50 To 250, Add <br />$64.38 <br />Quantity Unit Price <br />Factor <br />Total <br />Installation 95.00 x 0.60 <br />x <br />1.1294 <br />64.38 <br />Contractor's Price Proposal - Detail Page 2 of 5 <br />9/6/2023 <br />