My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3558
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 12:46:22 PM
Creation date
10/2/2023 2:01:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3558
Date (mm/dd/yyyy)
09/21/2023
Description
Agreement w/ Team Contracting, Inc., to replace the storm Drainage at Pier Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's Price Proposal - Detail Continues.. <br />Work Order Number: 120784.00 <br />Work Order Title: <br />City of Sunny Isles Beach - Piers Park Drainage Repairs <br />2. Drainage <br />23 <br />31 23 <br />16 <br />13 0013 <br />CY Compaction of Fill or Subbase for Trenches by Vibratory Plate, Air Tamper, <br />$415.22 <br />Etcetera <br />Quantity Unit Price Factor <br />Total <br />Installation 95.00 x 3.87 x 1.1294 <br />415.22 <br />24 <br />31 23 <br />16 <br />13 0013 <br />0072 <br />MOD For >50 To 250, Add <br />$104.07 <br />Quantity Unit Price Factor <br />Total <br />Installation 95.00 x 0.97 x 1.1294 <br />104.07 <br />25 <br />31 23 <br />16 <br />13 0016 <br />CY Load Excess Material by Machine for Removal from Excavation for Trenching <br />$236.61 <br />Quantity Unit Price Factor <br />Total <br />Installation 50.00 x 4.19 x 1.1294 <br />236.61 <br />26 <br />31 23 <br />16 <br />13 0016 <br />0076 <br />MOD For>20 To 50, Add <br />$118.59 <br />Quantity Unit Price Factor <br />Total <br />Installation 50.00 x 2.10 x 1.1294 <br />118.59 <br />27 <br />31 23 <br />16 <br />36 0007 <br />CY Excavation For Building Foundations And Other Structures By Hydraulic <br />$168.28 <br />Excavator, Backhoe, Loader in Loose Rocklncludes compacted aggregate <br />Quantity Unit Price Factor <br />Total <br />Installation 25.00 x 5.96 x 1.1294 <br />168.28 <br />28 <br />31 23 <br />16 <br />36 0007 <br />0015 <br />MOD For>20 To 50, Add <br />$126.21 <br />Quantity Unit Price Factor <br />Total <br />Installation 25.00 x 4.47 x 1.1294 <br />126.21 <br />29 <br />31 23 <br />16 <br />36 0018 <br />CY Backfilling Around Building Foundations And Other Structures By Hydraulic <br />$70.29 <br />Excavator, Backhoe, Loader <br />Quantity Unit Price Factor <br />Total <br />Installation 16.00 x 3.89 x 1.1294 <br />70.29 <br />30 <br />31 23 <br />16 <br />36 0018 <br />0018 <br />MOD For Up To 20, Add <br />$70.29 <br />Quantity Unit Price Factor <br />Total <br />Installation 16.00 x 3.89 x 1.1294 <br />70.29 <br />31 <br />31 23 <br />16 <br />36 0021 <br />CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures <br />$110.77 <br />by Vibratory Plate, Air Tamper, Etcetera <br />Quantity Unit Price Factor <br />Total <br />Installation 16.00 x 6.13 x 1.1294 = <br />110.77 <br />32 <br />31 23 <br />16 <br />36 0021 <br />0022 <br />MOD For Up To 20, Add <br />$110.77 <br />Quantity Unit Price Factor <br />Total <br />Installation 16.00 x 6.13 x 1.1294 = <br />110.77 <br />33 <br />31 23 <br />16 <br />36 0028 <br />CY Load Excess Material For Removal From Excavation For Building Foundations <br />$52.65 <br />and Other Structures by Machine <br />Quantity Unit Price Factor <br />Total <br />Installation 10.50 x 4.44 x 1.1294 <br />52.65 <br />34 <br />31 23 <br />16 <br />36 0028 <br />0026 <br />MOD For Up To 20, Add <br />$52.65 <br />Quantity Unit Price Factor <br />Total <br />Installation 10.50 x 4.44 x 1.1294 <br />52.65 <br />35 <br />33 31 <br />11 <br />00 0290 <br />LF 15" Smooth Interior, Double Wall, Corrugated Polyvinyl Chloride (PVC) Pipe <br />$4,575.43 <br />Quantity Unit Price Factor <br />Total <br />Installation= <br />120.00 x 33.76 x 1.1294 <br />4,575.43 <br />36 <br />33 31 <br />11 <br />00 0312 <br />EA 15" 1/8 Bend, Smooth Interior, Double Wall, Corrugated Polyvinyl Chloride <br />$661.65 <br />(PVC) <br />Quantity Unit Price Factor <br />Total <br />Installation 2.00 x 292.92 x 1.1294 = <br />661.65 <br />37 <br />33 42 <br />11 <br />00 0372 <br />EA 15" Coupling, Corrugated High Density Polyethylene (HDPE) Pipe <br />$87.75 <br />Quantity Unit Price Factor <br />Total <br />Installation 6.00 x 12.95 x 1.1294 <br />87.75 <br />Contractor's Price Proposal - Detail <br />Page 3 of 5 <br />9/6/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.