My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3557
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 8:59:26 AM
Creation date
10/10/2023 4:21:08 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3557
Date (mm/dd/yyyy)
09/21/2023
Description
ITB 23-05-02 agreement w/ Comtech Engineering, Inc for Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />unless provided express permission by the City. The City shall not provide the Contractor <br />access to private property without first obtaining the private property owner's consent. <br />7.16.4 The City will provide the Contractor with Work Activity Notices (Door Hangers), <br />which Contractor shall post on affected private properties no less than two (2) days in <br />advance of planned Work affecting said properties. <br />7.16.5 Days and Hours of Work. With the exception of designated holidays or work exclusion <br />dates as determined by the City during which no construction shall be performed, the <br />construction portions of the Work shall only be performed on the following days and times: <br />Monday through Thursday, between 7:00 a.m. and Sunset; <br />Friday, 7:00 am to 5:00pm; and <br />Saturday, 9:00am to 5:00pm, with prior notice to and approval from the City. <br />The only exception to the day and time limitations set forth in 7.16.5 herein will be in the <br />event of a life safety occurrence requiring immediate corrective action. <br />7.16.6 The Contractor shall be responsible for, and shall pay the cost of, all temporary <br />facilities used, or made available, during the course of the Work. These facilities include, <br />but shall not be limited to, electric power, gas, water, sewage, and sanitation, waste <br />removal and disposal, telephone, and temporary office supplies and equipment. The <br />Contractor shall timely pay for all such temporary facilities and shall coordinate the <br />installation and removal of such facilities including, but not limited to, any required <br />coordination with any utility company. Furthermore, the Contractor shall be responsible <br />for, and shall pay the cost of, any utility work which may be necessary in order to perform <br />the Work required by the Contract Documents; this responsibility includes, but is not <br />limited to, the cost of installing, moving, or relocating electric, water, sewer, gas, or other <br />utility lines, wires, poles, pipe, and any other equipment of every kind and nature. <br />Unforeseen conditions or situations which cannot be reasonably inferred from the <br />contract documents will be individually evaluated and charged to the contract <br />contingency. <br />7.16.7 The Contractor shall be responsible for receiving, off-loading,'storing and securing <br />materials supplied by utility companies in furtherance of the Work. Any damage, loss, or <br />deterioration to said materials shall be the sole responsibility of the Contractor. <br />7.16.8 In the event the Contractor damages existing utility facilities while performing the <br />Work, the Contractor shall immediately repair said damages at the expense of the <br />Contractor, and in a manner acceptable to the City. Contractor shall maintain the materials <br />and equipment necessary on the Project site to ensure that remedial repairs to utility <br />facilities can be effectuated without delay. <br />7.16.9 The Contractor shall immediately notify the City of any unforeseen condition or <br />deviation from the plans that the Contractor encounters in performance of the Work. The <br />Contractor's responsibility to notify the City of said unforeseen condition or deviation <br />applies in all circumstances, and is not contingent upon whether the Contractor intends to <br />make a claim for Concealed and Unknown Conditions pursuant to Section 8.3.3. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.