My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3557
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 8:59:26 AM
Creation date
10/10/2023 4:21:08 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3557
Date (mm/dd/yyyy)
09/21/2023
Description
ITB 23-05-02 agreement w/ Comtech Engineering, Inc for Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />8.2.3 The City's Consultant Engineer shall be the initial interpreter of the <br />requirements of the drawings and specifications and the judge of the performance there <br />under by the Contractor. The Engineer, through the City's Representative, shall render <br />written or graphic interpretations necessary for the proper execution or progress of the <br />Work with reasonable promptness on request of the Contractor. <br />8.2.4 The City's Representative will review the Contractor's Payment Requests and <br />will certify to the City for payment to the Contractor, those amounts then due the Contractor <br />as provided in this Contract. <br />8.2.5 The City's Representative shall have authority to reject Work which is <br />defective or does not conform to the requirements of this Contract. If the City's <br />Representative deems it necessary or advisable, the City's Representative shall have <br />authority to require additional inspection or testing of the Work for compliance with <br />Contract requirements. In the event additional inspections or testing are required pursuant <br />to this paragraph 8.2.5, the costs for all additional inspections or testing shall be the <br />responsibility for the Contractor. <br />8.2.6 The City's Representative will review and approve, or take other appropriate <br />action as necessary, concerning the Contractor's submittals including Shop Drawings, <br />Product Data, and Samples. Such review, approval or other action shall be for the sole <br />purpose of determining conformance with the Contract Documents. <br />8.2.7 The City's Representative will prepare Change Orders and may authorize <br />minor changes in the Work upon approval from the City by Field Order as provided <br />elsewhere herein. <br />8.2.8 The City's Representative shall, upon written request from the Contractor, <br />conduct inspections to determine the date of Substantial Completion and the date of Final <br />Completion, will receive and forward to the City for the City's review and records, written <br />warranties and related documents required by this Contract and will issue a final Certificate <br />for Payment upon compliance with the requirements of this Contract. <br />8.2.9 The Contractor agrees, acknowledges, and warrants that it has no third party <br />beneficiary rights, or other rights, arising out of any contract by and between the City, the <br />City's Representative, and/or the City's Consultant Engineer and, in the event of any <br />conflict between the terms and provisions of the contract by and between the City and the <br />City's Representative, and/or the City's Consultant and this Contract, the terms of this <br />Contract shall control with respect to the Contractor. <br />8.2.10 If the Contractor fails any inspection which requires a re -inspection by <br />the City's Representative or any of its consultants, the Contractor shall bear the cost of <br />such repeat inspection(s) which cost may be deducted by the City from any sums otherwise <br />due the Contractor. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.