My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3557
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 8:59:26 AM
Creation date
10/10/2023 4:21:08 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3557
Date (mm/dd/yyyy)
09/21/2023
Description
ITB 23-05-02 agreement w/ Comtech Engineering, Inc for Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />edition, as published by R.S. Means Company, Inc. Contractor submitted pricing <br />found to be in excess of five (5%) percent above the stated published pricing will <br />not be accepted and as such, no Contractor claims for delay will be accepted as a <br />result of extended response time due to excessive pricing submittal by the <br />Contractor. <br />10.3.3 The value of any change ordered under the Contract for extra work or <br />any reductions in work required, shall be determined under one or more of the following <br />procedures before a written change order is issued. <br />10.3.3.1 By Unit Price named in the contract or subsequently agreed upon <br />by the City and the Contractor, which prices shall include Contractor's <br />overhead and profit. <br />10.3.3.2 By Lump Sum Price agreed upon by the City and the Contractor, <br />which price shall include overhead and profit. A breakdown of the estimated <br />costs comprising the lump sum price may be required by the City's <br />Representative for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead <br />and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added <br />percentage, all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a) Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for <br />the Work shall be just and fully compensated for by adding an amount equal to <br />FIVE PERCENT (5%) of the sum of material and labor costs as defined under <br />Subcontractor's profit below, but excluding documented equipment rental costs. <br />(b) Subcontractor's profit may then be added to the above material costs <br />and labor costs including the Overhead allowance at the rate of SEVEN <br />PERCENT (7%) of the sum of those costs, excluding equipment rental costs. <br />(c) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools incidental to and required for the Work <br />accomplished by its own direct labor shall be considered to be just and fully <br />compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />(d) Contractor's overhead, including general supervision and the furnishing, <br />use and maintenance of small tools and equipment incidental to and required <br />for the Work accomplished by subcontractors shall be considered to be just and <br />fully compensated for by adding an amount equal to FIVE PERCENT (5%) of the <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.