Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />sum of material and labor costs as defined under Material costs and Labor costs <br />below, but excluding equipment rental costs and bond allowance. <br />(e) Contractor's profit may then be added into the above material costs and <br />labor costs, including the Overhead allowance at the rate of SEVEN PERCENT <br />(7%) of the sum of those costs, excluding equipment rental costs. <br />10.3.3.5 Bond Allowance: For maintaining the Public Construction Bond at <br />100% of the Contract Price, a sum of ONE PERCENT (1%) of the total cost of <br />the change (including material, labor, overhead and profit, and equipment rental) <br />shall be allowed on all change orders. <br />10.3.3.6 Material costs actually recorded by the Contractor and the <br />subcontractor as materials are delivered to the site and, as evidenced from <br />originally receipted invoices, listing appropriate quantities and unit prices. <br />Records in proper form shall be maintained and made available to the City's <br />Representative and the City at all times. <br />Material costs shall be at actual cost inclusive of conduit, couplers, elbows, glue, <br />end caps, pull string / tape, and delivery charges based on the Consumer Pricing <br />Index (CPI) effective August 1, 2023. The parties agree that a subsequent <br />evaluation of material costs will be accomplished every sixty (60) days after the <br />issuance of the Notice to Proceed to assess variances in market pricing for material. <br />Should it become necessary or proper during the term of the Contract to adjust the <br />Contract Price for variations in material costs based upon the CPI, the parties agree <br />that an equitable adjustment to the material costs for either increases or decreases <br />shall be accomplished by either a change in the Contract Price utilizing a Change <br />Order, or by contingency expenditure. <br />10.3.3.7 Labor Costs represented by the actual wages paid to all laborers, <br />apprentices, journeymen, and foremen involved in and necessary to completing <br />the particular construction operations, for each day and every hour such labor <br />teams and foremen are actually employed on the extra work required, including <br />the net cost of insurance, social security and Worker's Compensation. Records <br />in proper form shall be maintained and be made available to the <br />Engineer/Architect and the City at all times. <br />10.3.3.8 Rentals for special equipment or machinery such as power driven <br />roller, tractors, trucks, shovels, drills, mixers, pumps, hoists, etc. required for <br />the economical performance of the work at reasonable rental prices agreed upon <br />before work commences, shall be allowed to the Contractor and subcontractors <br />by the City's Representative and the City for each and every hour such special <br />equipment is in use on the particular work. To the sum of such equipment <br />rentals, no additional percentage shall be added. <br />10.3.3.9 Owned Equipment for certain owned heavy or specialized <br />equipment (defined as tools and equipment with an individual purchase cost of <br />more than Ten Thousand Dollars ($10,000)) brought on to the job site specifically <br />27 <br />