My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3557
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 8:59:26 AM
Creation date
10/10/2023 4:21:08 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3557
Date (mm/dd/yyyy)
09/21/2023
Description
ITB 23-05-02 agreement w/ Comtech Engineering, Inc for Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />for change order work shall be valued at 75 percent of the monthly rental divided <br />by 176 to arrive at a maximum hourly rate to be applied to the hours the equipment <br />is used performing the change order work. Fuel and an operator necessary to utilize <br />the equipment will be considered as a separate direct cost associated with the <br />change order work. No recovery will be allowed for heavy or specialized <br />equipment that is already on the jobsite and is necessary to complete work of the <br />original contract. No recovery will be allowed for hand tools, power tools, minor <br />equipment, work vehicles (including pickup trucks and cargo vans), simple <br />scaffolds, etc. The longest period of time that the equipment is to be required for <br />the work will be the basis for pricing. Downtime due to repairs, maintenance and <br />weather delays will not be allowed. <br />10.4 Minor Changes <br />10.4.1 The City's Representative, after first obtaining express written approval <br />from the City, shall have authority to order minor changes in the Work not involving <br />a change in the Contract Price or an extension of the Contract Time and not inconsistent <br />with the intent of this Contract. Such minor changes shall be made by written Field <br />Order, and shall be binding upon the City and the Contractor. The Contractor shall <br />promptly carry out such written Field Orders. <br />10.5 Effect of Executed Change Order <br />10.5.1 The execution of a Change Order by the Contractor shall constitute <br />conclusive evidence of the Contractor's agreement to the ordered changes in the Work, <br />this Contract as thus amended, the Contract Price and the Contract Time. The <br />Contractor, by executing the Change Order, waives and forever releases any claim <br />against the City for additional time or compensation for matters relating to or arising <br />out of or resulting from the Work included within or affected by the executed Change <br />Order. <br />10.6 Notice to Surety; Consent <br />10.6.1 As a condition precedent for the certification, approval or payment of any <br />Application for Payment, or as a condition precedent for the approval or execution by the <br />City of any Change Order, or as a condition precedent for any action required by the City <br />under this Contract, the City may demand and the Contractor shall furnish, an <br />appropriately executed Consent of Surety in such form as the City may specify. <br />10.7 Emergency Change Orders <br />10.7.1 In an emergency that presents immediate danger to person or property, <br />the City's designated representative may order a change in the Work that shall be <br />documented within three (3) days from the inception of said emergency in accordance <br />with the change order requirements of Article X of this Contract. <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.