Revised price sheet sent 8/25/2023.
<br />Golden Shores Pump Station Rehabilitation ITB 23-05-02
<br />18-2656
<br />Sunny Isles Beach, FL
<br />City of Sunny Isles Beach
<br />EY"alYr ,v'�s 1-0 UUT i f TOTAU;
<br />1
<br />General Requirements
<br />1
<br />LS
<br />$165,000.00
<br />$165,000.00
<br />2
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$36,000.00
<br />$36,000.00
<br />3
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$13,000.00
<br />$13,000.00
<br />4
<br />Prevention, Control and Abatement of Erosion and Water
<br />Pollution
<br />1
<br />LS
<br />$18,000.00
<br />$18,000.00
<br />5
<br />Utility Designating and Locating
<br />1
<br />LS
<br />$4,900.00
<br />$4,900.00
<br />6
<br />Clearing, Grubbing, Demolition, Removal, and Disposal
<br />1
<br />LS
<br />$115,000.00
<br />$115,000.00 p
<br />7
<br />Earthwork, Excavation, Embankment, and Site Grading
<br />1
<br />LS
<br />$.79,000.00
<br />$79,000.00
<br />8
<br />Catch Basins
<br />1
<br />EA
<br />$14,000.00
<br />$14,000.00
<br />9
<br />HP Storm Gray Pipe (High Performance Polypropylene
<br />Pipe)
<br />28
<br />LF
<br />$2,300.00
<br />$64,400.00
<br />10
<br />Modify Existing Manholes/Catch Basins
<br />1
<br />LS
<br />$45,000.00
<br />$45,000.00
<br />11
<br />Drainage Structure/Trash Interceptor Modification
<br />I
<br />LS
<br />$14,000.00
<br />$14,000.00
<br />12
<br />Plugging/Sealing 42" Sluice Gate Pipe Opening and
<br />Grouting/Abandoning 42" Pipe
<br />1
<br />LS
<br />$62,000.00
<br />$62,000.00
<br />13
<br />Drainage Pipe Joint Repair
<br />1
<br />LS
<br />$175,000.00
<br />$175,000.00
<br />14
<br />Retaining Wall
<br />1
<br />LS
<br />$39,000.00
<br />$39,000.00
<br />15
<br />Concrete Header Curb and Type D Curb
<br />1
<br />LS
<br />$4,200.00
<br />$4,200.00
<br />16
<br />Concrete Slab/Driveway/Sidewalk (6" Thick)
<br />6
<br />SY
<br />$500.00
<br />$3,000.00
<br />17
<br />Asphalt Driveway/Asphalt Pavement Reconstruction
<br />254
<br />SY
<br />$104.00
<br />$26,416.00
<br />18
<br />jPump Station Structural/Architectural Work
<br />I
<br />LS
<br />$960,000.00
<br />$960,000.00
<br />19
<br />Pump Station Mechanical Work
<br />1
<br />LS
<br />$710,000.00
<br />$710,000.00
<br />20
<br />Pump Station Electrical Work
<br />1
<br />LS
<br />$665,000.00
<br />$665,000.00
<br />21
<br />Pump Station Instrumentation Work
<br />1
<br />LS
<br />$210,000.00
<br />$210,000.00
<br />22
<br />Pump Station Standby Power System
<br />1
<br />LS
<br />$260,000.00
<br />$260,000.00
<br />23
<br />FPL Service Relocation
<br />1
<br />LS
<br />$31,000.00
<br />$31,000.00
<br />24
<br />Black Picket Fence, Gate, and Bollards
<br />1
<br />LS
<br />$51,000.00
<br />$51,000.00
<br />25
<br />Existing Tree Protection and Removal
<br />1
<br />LS
<br />$1,050.00
<br />$1,050.00
<br />26
<br />Sod and Irrigation Restoration
<br />1
<br />LS
<br />$13,500.00
<br />$13,500.00
<br />27
<br />Temporary portable pump rental to by-pass the station,
<br />6,000 gpm each
<br />2
<br />EA
<br />$51,000'00
<br />$102,000'00
<br />28
<br />Permitting Allowance
<br />1
<br />LS
<br />$ 10,000.00
<br />$ 10,000.00
<br />SUBTOTAL
<br />$3,951,166.00
<br />29
<br />Performance Bond
<br />1
<br />LS
<br />$90,600.00
<br />30
<br />Overhead and profit
<br />1
<br />LS
<br />$119,000.00
<br />Optional Item I Removal/Disposal of Unsuitable Soils and
<br />150
<br />CY
<br />$3,000.00
<br />TOTAL COSTJ
<br />$4,163,766.00
<br />a�.y,a��o,b„sam
<br />E.
<br />Jose Sierra
<br />° ` e g CN .".
<br />alta
<br />13,600)
<br />;4,000)
<br />;6,000)
<br />;$5,000)
<br />;$5,000)
<br />$5,000)
<br />($26,600)
<br />($26,600)
<br />Signature, I hereby attest that I have the authority to sign this notarized certification and certify that the above referenced information is true,
<br />complete and correct.