Laserfiche WebLink
Revised price sheet sent 8/25/2023. <br />Golden Shores Pump Station Rehabilitation ITB 23-05-02 <br />18-2656 <br />Sunny Isles Beach, FL <br />City of Sunny Isles Beach <br />EY"alYr ,v'�s 1-0 UUT i f TOTAU; <br />1 <br />General Requirements <br />1 <br />LS <br />$165,000.00 <br />$165,000.00 <br />2 <br />Mobilization/Demobilization <br />1 <br />LS <br />$36,000.00 <br />$36,000.00 <br />3 <br />Maintenance of Traffic <br />1 <br />LS <br />$13,000.00 <br />$13,000.00 <br />4 <br />Prevention, Control and Abatement of Erosion and Water <br />Pollution <br />1 <br />LS <br />$18,000.00 <br />$18,000.00 <br />5 <br />Utility Designating and Locating <br />1 <br />LS <br />$4,900.00 <br />$4,900.00 <br />6 <br />Clearing, Grubbing, Demolition, Removal, and Disposal <br />1 <br />LS <br />$115,000.00 <br />$115,000.00 p <br />7 <br />Earthwork, Excavation, Embankment, and Site Grading <br />1 <br />LS <br />$.79,000.00 <br />$79,000.00 <br />8 <br />Catch Basins <br />1 <br />EA <br />$14,000.00 <br />$14,000.00 <br />9 <br />HP Storm Gray Pipe (High Performance Polypropylene <br />Pipe) <br />28 <br />LF <br />$2,300.00 <br />$64,400.00 <br />10 <br />Modify Existing Manholes/Catch Basins <br />1 <br />LS <br />$45,000.00 <br />$45,000.00 <br />11 <br />Drainage Structure/Trash Interceptor Modification <br />I <br />LS <br />$14,000.00 <br />$14,000.00 <br />12 <br />Plugging/Sealing 42" Sluice Gate Pipe Opening and <br />Grouting/Abandoning 42" Pipe <br />1 <br />LS <br />$62,000.00 <br />$62,000.00 <br />13 <br />Drainage Pipe Joint Repair <br />1 <br />LS <br />$175,000.00 <br />$175,000.00 <br />14 <br />Retaining Wall <br />1 <br />LS <br />$39,000.00 <br />$39,000.00 <br />15 <br />Concrete Header Curb and Type D Curb <br />1 <br />LS <br />$4,200.00 <br />$4,200.00 <br />16 <br />Concrete Slab/Driveway/Sidewalk (6" Thick) <br />6 <br />SY <br />$500.00 <br />$3,000.00 <br />17 <br />Asphalt Driveway/Asphalt Pavement Reconstruction <br />254 <br />SY <br />$104.00 <br />$26,416.00 <br />18 <br />jPump Station Structural/Architectural Work <br />I <br />LS <br />$960,000.00 <br />$960,000.00 <br />19 <br />Pump Station Mechanical Work <br />1 <br />LS <br />$710,000.00 <br />$710,000.00 <br />20 <br />Pump Station Electrical Work <br />1 <br />LS <br />$665,000.00 <br />$665,000.00 <br />21 <br />Pump Station Instrumentation Work <br />1 <br />LS <br />$210,000.00 <br />$210,000.00 <br />22 <br />Pump Station Standby Power System <br />1 <br />LS <br />$260,000.00 <br />$260,000.00 <br />23 <br />FPL Service Relocation <br />1 <br />LS <br />$31,000.00 <br />$31,000.00 <br />24 <br />Black Picket Fence, Gate, and Bollards <br />1 <br />LS <br />$51,000.00 <br />$51,000.00 <br />25 <br />Existing Tree Protection and Removal <br />1 <br />LS <br />$1,050.00 <br />$1,050.00 <br />26 <br />Sod and Irrigation Restoration <br />1 <br />LS <br />$13,500.00 <br />$13,500.00 <br />27 <br />Temporary portable pump rental to by-pass the station, <br />6,000 gpm each <br />2 <br />EA <br />$51,000'00 <br />$102,000'00 <br />28 <br />Permitting Allowance <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />SUBTOTAL <br />$3,951,166.00 <br />29 <br />Performance Bond <br />1 <br />LS <br />$90,600.00 <br />30 <br />Overhead and profit <br />1 <br />LS <br />$119,000.00 <br />Optional Item I Removal/Disposal of Unsuitable Soils and <br />150 <br />CY <br />$3,000.00 <br />TOTAL COSTJ <br />$4,163,766.00 <br />a�.y,a��o,b„sam <br />E. <br />Jose Sierra <br />° ` e g CN .". <br />alta <br />13,600) <br />;4,000) <br />;6,000) <br />;$5,000) <br />;$5,000) <br />$5,000) <br />($26,600) <br />($26,600) <br />Signature, I hereby attest that I have the authority to sign this notarized certification and certify that the above referenced information is true, <br />complete and correct. <br />