|
0
<br />0
<br />•
<br />B
<br />�G > Calvin, Giordano
<br />f E X C E P T I O N A
<br />8 Associates, Inc.
<br />i 0 L U T I 0 N i
<br />Robert McSweeney, PE, Page 3
<br />Wiles Road Extension, West of Lyons Road to West of Florida's Turnpike, Broward County, Florida. Senior
<br />Project Administrator for the roadway extension of a multi -lane divided section including drainage, utility
<br />installations (water main, gravity sewer, force main and lift station modifications), signalization modifications,
<br />roadway lighting, landscaping and irrigation, and pavement markings and signage.
<br />NW 12th Street, West of NW 107th Avenue to East of NW 136th Avenue, Miami -Dade County, Florida. Senior
<br />Project Administrator for the roadway construction and /or widening of a multi -lane divided section including
<br />bulkhead /seawall installation, culvert(s) extensions, roadway foundation stabilization (geo- textile installation),
<br />concrete barrier wall installation, drainage, utility installations (water main and force main), railroad crossing
<br />modification, signalization, roadway lighting, landscaping and irrigation, and pavement markings and signage.
<br />SR 7 (US 441), South of Griffin Road to South of Stirling Road, Broward County, Florida. Senior Project
<br />Administrator for the roadway reconstruction and widening of a multi -lane divided section including drainage
<br />modifications /retention area construction, signalization, roadway lighting, landscaping and irrigation, and pavement
<br />markings and signage.
<br />NW 12th Street /HEFT Interchange, Connection with the Homestead Extension of Florida's Turnpike (HEFT)
<br />Miami -Dade County, Florida. Senior Project Administrator for the intersection connection of the mainline HEFT
<br />to NW 12th Street (excluding toll booth buildings) including ramp connections, two Flat slab bridges crossing
<br />Snapper Creek Canal, drainage improvements (including lake construction), concrete barrier wall, utility
<br />installations (water main, force main including aerial crossings, and lift stations), signalization, roadway lighting,
<br />landscaping and irrigation, and pavement markings and signage.
<br />Palmetto Expressway (SR 826/NW 167th Street), North of NW 154th. Street to West of the Golden Glades
<br />Intersection, Miami -Dade County, Florida. FDOT Senior Project Administrator for the milling and resurfacing of
<br />the mainline, ramps and adjacent frontage roads (NW 167th Street) and intersections for three concurrent/
<br />adjoining FDOT projects. The work involved included milling and resurfacing, concrete barrier wall modifications,
<br />signalization improvements /modifications, roadway lighting, overhead signage installation(s), pavement markings
<br />and signage, landscaping, bridge deck cleaning, and utility adjustments.
<br />NW 40th Street, West of NW 54th Avenue to East of SR 7 (US 441), Coconut Creek, Florida. Construction
<br />Administrator for the roadway widening and modifications of a divided section including drainage modifications/
<br />improvements, intersection modifications, utility installations (water main and sewer services), landscaping and
<br />irrigation, and pavement markings and signage.
<br />36
<br />
|