My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Calvin Giordano & Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:25:05 AM
Creation date
8/28/2014 2:59:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering Svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br />E X i E P T 1 O N A L i O L U T I 0 N .< <br />David Stambaugh, PE, Page 2 <br />of record, the services included preparation of plans and specifications for permitting and construction, review of <br />shop drawings and final certification. <br />Wastewater Reclamation Facility Expansion Design /Build project, Miramar, Florida. Prepared plans and <br />specifications for the addition of an aeration basin, clarifier, process air blower and deep well injection pump. <br />Assisted with the preparation of a guaranteed maximum price proposal to the City of Miramar. Secured permit <br />from governmental agencies having jurisdiction over the project. Provided documentation of work progress during <br />construction and assisted with project scheduling, equipment startup, preparation of the record drawings and final <br />certification of construction completion. <br />Water Treatment Plant Improvements Phase 111, Pembroke Pines, Florida. Coordinated equipment start <br />up for an upflow treatment unit, lime slaker, multi -media filter, ion exchange color removal system, and sodium <br />hypochlorite storage and injection system. Designed a carbon dioxide storage and feed system. Prepared record <br />drawings, project closeout documents and certification of construction completion packages to governmental <br />permit agencies. <br />WATER AND WASTEWATER TREATMENT PLANT DESIGN <br />Alternative Water Supply Project, Pembroke Pines, Florida. Provided project management for the preparation <br />of the design criteria package for advanced wastewater treatment through the best available technology, including <br />reverse osmosis and advanced oxidation, for the reclamation of secondary treated wastewater suitable for aquifer <br />recharge. Implemented a pilot testing program for the evaluation ofthe selected treatment processes to demonstrate <br />the ability to meet regulatory requirements. Managed overall pilot operations, which included equipment delivery, <br />start up, operation, collection of samples for laboratory analysis and preparation of the final report. <br />Wastewater Treatment Plant Expansion Phase IV, Davie, Florida. Assisted with the design of plans and <br />specifications for the addition of a package treatment unit and associated equipment for the expansion of the <br />wastewater treatment plant. <br />East Water Treatment Plant Improvements, Miramar, Florida. Assisted with the submission of plans and <br />specifications for the addition of a lime sludge handling facility and modifications to the administration and control <br />building for the City of Miramar during the bid process. <br />Water Treatment Plant Risk Management Plan, Pembroke Pines, Florida. Assisted with the preparation of <br />a Risk Management Plan to prevent and minimize the impact of an accidental release of chlorine gas. Provided <br />training for operations personnel on the standard operating procedures. Prepared submittal to the United States <br />Environmental Protection Agency for compliance with 40 CFR Part 68 Chemical Accident Prevention Provisions. <br />UTILITY ENGINEERING DESIGN <br />Lloyd Estates Drainage Improvements, Oakland Park, Florida. Administered all project scope of services for <br />the design of an improved stormwater manager system to aid in the reduction of Flood duration and elevation <br />during storm events within the Lloyd Estates neighborhood. The improvements include the addition of emergency <br />Flood gates to prevent the elevated water level in the SFWMD C -13 canal from Flowing into the Sleep River that <br />provides water storage for the existing drainage system. In addition, a stormwater pump station will be provided to <br />regain the permitted discharge capacity of the system. Grant services were provided for this project that resulted in <br />approximately $4 million of funding from the FEMA Hazard Mitigation Grant Program. <br />Bid Pack 8 Infrastructure Improvements, Oakland Park, Florida. Coordinated team activities as the project <br />administrator to design and permit approximately 18,000 linear feet of water replacement, rehabilitation of Lift <br />Station B -1 and installation of 4 sewer combination air valves to alleviate undesirable air inside the City's sanitary <br />sewer forcemain system. <br />Bid Pack 9 Infrastructure Improvements, Oakland Park, Florida. Served as the project manager and engineer <br />of record for the replacement of approximately 20,000 linear feet of watermains, three lift stations and three <br />separate forcemains that have reached the end of their useful life. The project also included the design of a new <br />drainage system as well as the optimization of the existing drainage system to provide the much needed stormwater <br />management for the residents. Coordinate meetings with the residents within the project area to assist with the <br />understanding of the project goals and address their concerns. 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.