My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:04:32 PM
Creation date
8/28/2014 3:19:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />RFO No. 14 -07 -02 115 <br />WOLFBERG ALVAREZ & PARTNERS <br />Florida International University Continuing Architectural Services Contract <br />Miami, FL <br />CONTINUING <br />SUIiVICCS <br />CON` RAC t <br />As part of an architectural continuing services contract <br />with the university, which was renewed three times, WA <br />provided architecture and engineering services for mis- <br />cellaneous projects at all of the South Florida campuses. <br />U.S. Century Bank Arena Renovations - Remodeling <br />of the new 6,400 SF locker rooms in the US Century <br />Bank Arena including complete remodeling of the bas- <br />ketball locker rooms. Engineering services included new <br />plumbing, electrical and HVAC modifications. The locker <br />rooms called for upgraded finishes and built -in furniture <br />commensurate with the heightened profile that has been <br />established by the university. <br />Client <br />Florida International University <br />Miami, FL <br />Services <br />Programming, Planning, Architecture, Mechanical, <br />Plumbing and Electrical Engineering <br />Project Cost <br />5500,000 - 54,000,000 <br />Window Replacement - Windows were replaced at the <br />FIU Library in order to address water infiltration, improve <br />energy efficiency and meet current windstorm building <br />code requirements. Approximately 15,000 SF of curtain <br />wall was replaced along with structural upgrades to ex- <br />isting building. <br />Weatherproofing - SAAC Building required extensive <br />stucco repairs to existing building, window replacement, <br />installation of new perimeter window and door sealants <br />and new waterproofing paint system to address signifi- <br />cant water intrusion issues. <br />Elevator Replacements - Modernization and replace- <br />ment of elevators on the BBC campus in the Wolfe Cen- <br />ter, Academic I Building, and the Hospitality Management <br />Building. New elevator lobby and new electrical and <br />HVAC systems for elevators and machine rooms. <br />Emergency Structural Repairs - Within one week of <br />signing the architectural continuing service contract, FIU <br />had a emergency structural issue in Building W -9. The <br />WA team responded within hours to stabilize the building <br />and commence with repairs and structural upgrades. <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.