Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br />RFO No. 14-07-021,36 <br />WOLFBERG ALVAREZ & PARTNERS <br />ZACK WETHINGTON, AIA, <br />Relevant Project Experience <br />LEED AP <br />Project Architect <br />City of Miami Hadley Park Youth Center, Miami, FL A new community <br />youth center located in Charles Hadley Park for the City of Miami. The <br />project will consist of classroom spaces, meeting rooms, administrative <br />offices, computer lab, basketball gymnasium for 2,500 people and weight <br />Education <br />room. The project is seeking LEED Silver Accreditation from the USGBC. <br />Bachelor of Science Architecture <br />University of Kentucky <br />1997 <br />University of Miami Alex Rodriguez Park at Mark Light Field Phased <br />Renovation and Building Addition, Master Planning, Coral Gables, <br />Registration <br />FL The project provides the complete upgrade of the existing Mark Light <br />Florida Registered Architect <br />Stadium with the addition of a new 3 story athletic facility which includes, <br />AR095553 <br />team locker and training rooms, meeting rooms, video room clubhouse <br />suites and press box area. This project also included the renovation of the <br />Experience <br />Ron Frasier building. <br />A Florida Registered Architect with over four- <br />teen years of experience which includes a <br />City of Miami Fire Station #13, Miami, FL New 11,000 SF facility will be <br />vide range of exceptional projects, from mas- <br />the first LEED Silver Fire Station in South Florida serving the Northern <br />ter planning, mixed-use residential and com- <br />mercial, institutional, ional, aviation /transportation, <br />Boundary of the City of Miami. This Emergency Facility has been design <br />residential as well as government facilities. <br />above current Codes and able to resist the winds of a Category 5 Hurri- <br />This wide range of expertise has provided a <br />cane and has a back -up power system able to run non -stop for 7 days <br />unique all- encompassing vision and process <br />without power in -case of a natural disaster. This project is currently of for <br />which shows through his body of work. With <br />Bid. <br />every project he takes a hands -on approach <br />to all of his work, ensuring full integration of <br />City of Miami Police Headquarters Addition and Heliport Building <br />the natural and built environment. He under- <br />Renovation and New Construction, Miami, FL The project consisted of <br />stands that architecture is about construction <br />a building addition and renovation to the City of Miami Police Department <br />and technology, fused together by design and <br />Headquarters Building in Down town Miami and an upgrade to the existing <br />ate <br />constantly exploring new and avalue and <br />ways to create structures of rich value and <br />Heliport. The building addition was the expansion of the administration <br />lasting impact. <br />offices and evidence storage facility, also in the scope was the renovation <br />to the adjacent existing office space which abutted the new office area. <br />The Police Department also needed an upgrade to their existing Heliport <br />that they were unable to use due to maintenance issues. <br />Miami International Airport South Terminal Expansion, Miami, FL <br />New 1.2 million SF terminal provides service to the existing Concourse H <br />and the new Concourse J and adds over a 1,000 linear feet of new curb- <br />side frontage adjacent to the upper and lower vehicular drives with provi- <br />sions for curbside baggage check -in, 130 new ticket counters serving 22 <br />domestic and international carriers, a ticketing lobby with 75 feet width of <br />queuing space, airline ticket offices, 2 -TSA operated security checkpoints <br />and retaillfood and beverage concession mall. <br />Miami Jackson Senior High- Phased Replacement New Construction, <br />Master Planning, Renovation, Miami, FL A phase replacement of the <br />existing facility creating a new school, as well as the renovation of existing <br />building that is to remain. This project provides the necessities of the <br />increasing population that this facility requires, while still maintaining a <br />sense of the history and pride that the school has developed. <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />