Laserfiche WebLink
L.] <br />Bachelor of Science in <br />Civil <br />Engineering <br />University of Michigan <br />April 1981 <br />Major: Civil Engineering <br />PROFESSIONAL <br />EXPERIENCE <br />Experience Prior to BNI: 5 <br />years <br />With BNI since 1986 <br />PROFESSIONAL <br />REGISTRATIONS <br />Licensed Professional <br />Engineer - Florida <br />Certified Special Inspector <br />Florida <br />PROFESSIONAL <br />ASSOCIATIONS <br />American Institute of <br />Steel <br />Construction <br />Florida Structural <br />Engineering <br />Association <br />National Council of Examiners for <br />Engineering and Surveying <br />CITY OF SUNNY ISLES BEACH I Yo <br />RFQ No. 14 -07 -02 <br />WOLFBERG ALVAREZ & PARTNERS <br />PAULA. ZILIO, PE <br />Senior Principal /Partner <br />Paul worked in a variety of roles for a major general contractor and became a <br />Certified General Contractor prior to joining BNI. Since joining BNI. Paul has worked <br />on a number of design -build projects and often served as Threshold Inspector. <br />These experiences have given Paul a unique insight into partnering and the value <br />of good and timely communication and have helped lead BNI to recommendations <br />by a number of contractors- <br />Paul has designed a variety of structural systems, including cast -in -place concrete, <br />composite precast concrete. tilt -up concrete, and structural steel. He works closely <br />with designers and builders, regardless of delivery method, to make structural <br />decisions that balance aesthetics, constructability. cost and schedule. <br />Relevant Projects <br />GOVERNMENT <br />Dinner Key Dockmaster Building, Coconut Grove, Florida <br />• Four -story. 8400 -SF building located in a VE flood zone <br />• Principal In Charge <br />Tri -Rail Station, Pompano Beach. Florida <br />• This major upgrade to the Pompano Beach Tri -Rail Station includes hvo 25' x <br />400' platforms on grade with canopies for the northbound and southbound <br />stations, with stairs and elevators, and a pedestrian overpass /overhead <br />walkway. <br />• Principal In Charge. Engineer of Record. Project Manager <br />GSA Trade Shop Facility, Miami, Florida <br />• 100,000 -SF trade warehouse including a 20.000 -SF office /storage space <br />mezzanine. and parking for 214-cars <br />• Principal In Charge. Engineer of Record. Threshold Inspector <br />Broward County Judicial Complex, Fort Lauderdale, Florida <br />• Two Six Story, 349,000 -SF, Office and Courtroom Wings <br />• Spread footings on soils improved by vibro- flotation /stone columns, composite <br />precast concrete, and architectural precast concrete. <br />• Three Pedestrian Bridges designed with structural steel spanning 125 -ft to <br />189 -ft <br />• Project Engineer <br />North County Government Center, West Palm Beach, Florida (Design - Build) <br />• 72,000 -SF Addition and 32.000 -SF Renovation of an existing 2 -story <br />courthouse building <br />• Engineer of Record. Project Manager <br />City of Hialeah Courthouse, Hialeah, Florida <br />www.bniengine ers.com <br />Fliami I Tallahassee I west Palm Beach <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />