Laserfiche WebLink
JORGE MALDONADO, PE <br />Civil Engineer <br />Education <br />Bachelor of Science Civil Engineering <br />Florida International University <br />1997 <br />CITY OF SUNNY ISLES BEACH <br />RFO No. 14 -07 -02 39 <br />WOLFBERG ALVAREZ & PARTNERS <br />Relevant Project Experience <br />Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New <br />master plan and new 5,000 SF tennis center for the City of Miami Beach <br />at historic Flamingo Park. The new tennis center will have 17 hydro grid <br />courts, a new restroom building, new handball courts, new tot lot, a new <br />water feature at the center of the park, and new lighting, fencing, land- <br />scaping and shade trees along pedestrian promenades. <br />Registration <br />State of Florida No. 58684 <br />Palmetto Bay Community Center and Library at Bayside Park, Pal - <br />metto Bay, FL New 9,000 SF Library and community center that also <br />Experience <br />functions as a neighborhood park for special events, and is located next to <br />Mr. Maldonado is an experienced Civil Engi- <br />an environmentally - oriented park. <br />neer with over 10 years of experience in the <br />engineering profession. His diverse range of <br />City of Miami Parks and Recreation, Miami, FL Through a continuing <br />expertise and responsibilities included plan- <br />services contract, WA performed improvements and upgrades to 17 parks <br />ning, designing, permitting and construction <br />throughout the City. The scope of work varied from park to park, but in- <br />management of water distribution systems, <br />cluded site adaptation, master planning, and other site related services for <br />sanitary sewer systems, paving and drain- <br />athletic facilities and park design of football, soccer, baseball and softball <br />age systems, and roadway improvements for <br />fells, sports lighting, including bleachers, dug -outs, batting cages, sport <br />both municipal and private sector projects, in- <br />eluding the preparation of engineering plans, <br />lighting and field events such as high jump and pole vault etc. <br />specifications and technical reports. Mr. Mal- <br />donado is also experienced in contamination <br />Evelyn Greer Park, Pinecrest, FL New 10 -acre park that includes two <br />assessment of soil and groundwater at pe- <br />soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging <br />troleum and hazardous waste contaminated <br />path with fitness stations, a covered shelter and a 5,000 SF community <br />sites, environmental engineering design and <br />center consisting of an activity room, public restrooms, administrative park <br />permitting of pollution control facility modifi- <br />offices, a snack shop, a large recreation shelter for public gatherings, a <br />rations and compliance audits at sites in Mi- <br />covered children's playground, and parking for 140 vehicles. <br />ami -Dade County. <br />Suniland Park, Pinecrest, FL Improvements to a 10 acres of active park <br />space with multipurpose athletic fields (baseball and football), batting cag- <br />es, a recreation center, basketball courts, an Internet Wi -Fi Spot and a tot <br />lot. New community center was constructed as well. <br />Jeanne Levy Jewish Community Center of the Palm Beaches, West <br />Palm Beach, FL Design of a new 121,000 SF community and recreation <br />center. The Center includes recreational facilities such as: six tennis <br />courts, soccer and softball fields, a gymnasium with two basketball courts, <br />Olympic -size swimming pool, racquet ball courts and an aerobics room. <br />Florida City Youth Community Center, Florida City, FL New 21,500 SF <br />youth activity and community center featuring a wide range of activities for <br />specialized uses including an indoor basketball gym with folding bleachers <br />that seat 240. The buildings surround a secure open courtyard in which <br />social activities and other events can take place. <br />Crandon Park and Marina, Key Biscayne, FL Principal -in- charge for the <br />development of a comprehensive program for the expansion and improve- <br />ments to facilities at Crandon Park and Manna. <br />ARCHITECTURE <br />ENGINEERING <br />PLANNING <br />INTERIOR DESIGN <br />