My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB # 24-01-01 CARPET & FLOOR MAINTENANCE SERVICES
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-01-01) Carpet & Floor Maintenance Services
>
ITB # 24-01-01 CARPET & FLOOR MAINTENANCE SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 4:04:15 PM
Creation date
1/10/2024 4:00:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Carpet and Floor Maintenance Services | Bid No. 24-01-01 26 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />-Polishing with equipment side to side with defender grip pad, apply salt to the marble floors to <br />enhance and maintain the shine. <br />Using marble polisher or crystallization process. <br /> <br />Stain removal: <br />-Treat stains using appropriate marble cleaning solutions to prevent damage to the polished <br />surface. <br /> <br />Sealing: <br />-Application of a marble sealer to protect against stains and moisture. <br /> <br />Floor inspection: <br />-Periodic inspection of Marble floors for signs of wear, damage or problems that require attention, <br />any damage or problem should be notified to the City of Sunny Isles Beach. <br /> <br />WOOD LAMINATE FLOOR: <br /> <br />Cleaning procedures: <br />-Scope of work includes, but is not limited to sweeping, mopping, spot cleaning, and <br />ensuring general cleanliness and maintenance of floor surfaces. <br /> <br />Polishing <br />-Once a year strip out the wax coat and reapply 5 to 6 coats of was coats (as needed). <br /> <br />3.6 LOST & FOUND <br /> <br />It is the responsibility of the Contractor to ensure all articles of personal or monetary value found <br />by employee are immediately turned in to the manager of each facility or the Contract <br />Administrator. <br /> <br />3.7 INSPECTIONS <br /> <br />The City representative, shall make inspections at times deemed appropriate to assure timely <br />performance in strict compliance with all specification requirements in all areas being serviced. A <br />check list shall be used for each floor and is to be filled out and approved each week. Include a <br />sample of the checklist with bid submittal. Any work not done to the satisfaction of the City shall <br />be corrected within 24 hours, at the Bidder’s sole expense. <br /> <br />3.8 CONTRACTOR QUALITY CONTROL PROGRAM <br /> <br />The Contractor shall have a total quality control program to ensure the requirements of the <br />Contract are met as specified. A Quality Control Plan (QCP) shall be submitted for review and <br />approval within ten (10) days of Contract award. The QCP shall be a system for identifying and <br />correcting deficiencies in the quality of services before the level of performance becomes <br />unacceptable and/or City staff points out the deficiencies. Deductions will be taken for <br />deficiencies. The QCP shall include an inspection system which is tailored to the specific facility
The URL can be used to link to this page
Your browser does not support the video tag.