Laserfiche WebLink
DocuSign Envelope ID: ACDD6E9D-77A6-4004-B7F8-CC44A3828C04 <br />Alt Form 525-010-6OeA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OA <br />STATE -FUNDED GRANT AGREEMENT PROGRAMMANACEMENT <br />05/21 <br />EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: FM453251-1-54-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />CITY OF SUNNY ISLES BEACH (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: Length 1,745' Collins Ave. (A1A) Station Points 94.6 north to Station 113.9. <br />PROJECT DESCRIPTION: To provide the community with a safe north -south connection to support multi -modal <br />transportation. The proposed project is approximately 1,745' in length and is located to the west of Collins Avenue, State <br />Road A1A, along the outer edge of the Golden Shores residential neighborhood. It will offer a safe connection for <br />pedestrians, cyclists and micro mobility users that connects Heritage Park and Golden Shores Park and multi -family <br />buildings at the north to the city center to the south. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by 8-16-2021 <br />b) Design to be completed by 11-14-2023 <br />c) Right -of -Way requirements identified and provided to the Department by 9-28-2023 <br />d) Right -of -Way to be certified by 11-28-2023 <br />e) Construction contract to be let by 2-1-2024 <br />f) Construction to be completed by 4-30-2024 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />Page 1 of 1 <br />