Laserfiche WebLink
DocuSign Envelope ID: ACDD6E9D-77A6-4C04-B7F8-CC44A3828C04 <br />Alt Form 525-010-6OeB STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OB <br />STATE -FUNDED GRANT AGREEMENT PROGRAM <br />MANAGEMENT <br />8/21 <br />Page 1 of 1 <br />EXHIBIT B <br />SCHEDULE OF FINANCIAL ASSISTANCE <br />RECIPIENT NAME & BILLING ADDRESS: <br />FINANCIAL PROJECT NUMBER: <br />CITY OF SUNNY ISLES BEACH4532511,4 <br />01 <br />18070 COLLINS AVENUE <br />SUNNY ISLES BEACH, FI 33160 <br />MAXIMUM PARTICIPATION <br />PHASE OF WORK by Fiscal Year: <br />TOTAL PROJECT FUNDS <br />LOCAL FUNDS <br />STATE FUNDS <br />Indicate source of <br />Local funds <br />Design- Phase 34 Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Design Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Right -of -Way- Phase 44Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY:ffM Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Right -of -Way Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />Construction- Phase 54 Maximum Department Participation <br />$450,000.00 <br />$225,000.00 <br />$225,000.00 <br />❑ In -Kind <br />FY: (Local Transportation Projects) <br />® Cash <br />FY: WA Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Cost <br />$450,000.00 <br />$225,000.00 <br />$225,000.00 <br />Construction Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />Engineering and (Insert Program Name) <br />❑ Cash <br />Inspection - Phase 64 <br />FY: MR <br />FY: Im Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total Construction Engineering and Inspection Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />(Phase) Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />FY: (Insert Program Name) <br />❑ Cash <br />FY: M,,q Maximum Department Participation <br />$ <br />$ <br />$ <br />❑ In -Kind <br />(Insert Program Name) <br />❑ Cash <br />Total : � ` �5� Cost <br />$ 0.00 <br />$ 0.00 <br />$ 0.00 <br />% <br />% <br />% <br />TOTAL COST OF THE PROJECT <br />$450,000.00 <br />$225,000.00 <br />$225,000.00 <br />COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475, FLORIDA STATUTES: <br />I certify that the cost for each line item budget category has been evaluated and determined to be allowable, reasonable, and necessary as required by <br />Section 216.3475, F.S. Documentation is on file evidencing the methodology used and the conclusions reached. <br />Jessica Beck -Galindo, MPA <br />District Grant Manager Name <br />Signature Date <br />