My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3600
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2024 5:08:09 PM
Creation date
1/24/2024 5:06:07 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3600
Date (mm/dd/yyyy)
01/18/2024
Description
Agreement with Redspeed Florida LLC for installation of Red Light Cameras.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.5.18.a The camera or video system should simulate an infraction being <br />recorded for testing purposes? <br />5.5.18.b The camera or videos stem should communicate error messa es? <br />5.5.18.c The camera or video system should record date and time of system <br />shutdown in the event of a malfunction? <br />5.5.19 The camera or video system should allow a malfunction to be easily <br />identified and debugged online. <br />5.5.20 The camera or video system should comply with 5.1.6 to substantiate <br />multiple and/or simultaneous infractions occurring during any single red signal <br />phase. Ex. Two or more vehicles run the same red light at the same time <br />(Sample infraction images to demonstrate this capability are required as part <br />of this proposal). <br />5.5.21 System should provide 24/7 "live" intersection monitoring and viewing <br />capabilities from any mobile computer or smart phone. <br />5.5.22 All camera system component operations should be synchronized to a <br />single, standard, independent, external and verifiable time and date source. <br />Explain how. <br />5.6 Operations and Public Awareness <br />5.6.1 Describe the Project Management method to be used by the <br />Contractor to ensure a successful project implementation for the City? <br />5.6.2 Describe the skills and qualifications of the Project manager and the <br />implementation team members that will be assigned to this project? <br />5.6.3 Provide a proposed time -line that will allow the program to meet the <br />below deadlines: (Please attach time -line to RFP response) <br />- Become operational for the issuance of Warning Notices of <br />Violation. <br />— Be capable of issuing actual Notices of Violation to vehicle owners. <br />5.6.4 Provide a list of City responsibilities/tasks from the perspective of the <br />contractor? <br />17-29 Red Light Enforcement 103 of 105 Exhibit A <br />Opens 4/21 <br />2017 at 2:30 <br />M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.