My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3600
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2024 5:08:09 PM
Creation date
1/24/2024 5:06:07 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3600
Date (mm/dd/yyyy)
01/18/2024
Description
Agreement with Redspeed Florida LLC for installation of Red Light Cameras.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.7.6 Contractor should prepare the notice letters referenced in Section <br />5.2.6 for all chargeable infractions and will mail such notice letters to all <br />vehicle owners. The Contractor should include a return envelope for <br />payMents with all notice letters. <br />5.7.7 Contractor should provide all required notice processing supplies <br />including, paper, envelopes, postage, toner, and all notice printing <br />supplies. <br />5.7.8 Notices should include one set of images and a license plate <br />image, as well as instructions as to viewing the alleged infraction via the <br />internet. <br />5.7.9 Contractor should provide a means for the fines to be paid on-line <br />by credit or debit card. <br />5.7. 10 Contractor should provide a means for the fines to he paid by phone <br />using a credit or debit card. <br />5.7.11. Describe the revenue sharing formula? <br />5.7.12 Contractor should provide a process to relocate previously <br />5.7.13 Identify any costs, (if any) to the City, related to the relocation of <br />previously installed Red Light Camera Enforcement equipment, to a <br />new location. <br />5.7.14 Identify the period of time in days to perform the initial installation of <br />the vendor's system and for it to become operational? <br />5.7.15 Identify the period of time in days to relocate previously installed <br />Red Light Camera Enforcement equipment from the initial <br />location to a different location and for it to become operational? <br />5.7.16 The Police Department should receive collected funds from violators <br />on a regular scheduled agreed upon by the Police Department (ex. Monthly). <br />17-29 fled Light Enforcement 105 of 105 Exhibit A Opens 4121/2017 at 2:30 P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.