My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Green Facility ITB 24-01-01 (2)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-01-01) Carpet & Floor Maintenance Services
>
RESPONSES
>
Green Facility ITB 24-01-01 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 11:22:04 AM
Creation date
2/2/2024 11:21:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
insurance as required, and that they will require the Sub-Contractor(s) to furnish to them <br />insurance certificates similar to those required by the City in this section. <br />Q7.Additionally, could you explain the content on page 39, specifically the attachment for <br />the "JANITORIAL SERVICE QUALITY CONTROL REPORT TEMPLATE AND CHECKLIST PER <br />FLOOR"? Does this refer to a template and checklist for quality control reports for janitorial <br />services on each individual floor, or does it pertain to different types of flooring, such as <br />terrazzo, carpet, tile, and VCT? <br />A7. Per page 36 of the ITB, the bidder must provide a checklist to explain their approach/ <br />methodology to servicing each floor type, and the facilities/locations/floors. <br />Q8. Understanding the budget parameters will significantly assist us in tailoring our proposal <br />to align with the financial considerations outlined for this project. <br />A8. Refer to A1. <br />Q9. Who is the current contractor? <br />A9. Green Facility Inc. <br />Q10. What is the current contract price being paid for each floor type today? <br />A10. The city does not have this information currently available, as billing/invoicing is not <br />specified by floor type but by facility/location. <br />Q11. What is your budget? <br />A11. Refer to A1. <br />Q12. What is the approx. value of the contract? <br />A.Refer to A1. <br />Q13. Can you provide floor drawings/layouts? <br />A13. Not available. <br />Q14. Why is the bid being send out now? <br />A14. Per the City’s Purchasing Code, Chapter 62, contracts over $50,000.00 require a formal <br />sealedprocurement method, such as an Invitation to Bid. <br />Q15. Regarding VCT are we responsible for replacing any already damaged tiles? <br />A15. No <br />Q <br />16. What is the required amount of coats of wax required for the VCT floors? <br />A16. Refer to page 25 of ITB. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.