My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SFM SERVICES - LF
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-01-01) Carpet & Floor Maintenance Services
>
RESPONSES
>
SFM SERVICES - LF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 11:55:54 AM
Creation date
2/2/2024 11:55:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.TRANSITIONA PLAN <br />CLIENT NAMESTART DATEIMPLEMENTATION LEAD <br />The City of Sunny Isles Beach <br />T.B.D.Alejandro Di Cola <br />Purpose: <br />In order to achieve a seamless transition, SFM implements a 10-Step Transition Plan tailored to meet the <br />specific needs of each contract. Every location or sitewill follow the same transition plan with the only <br />variance being staffing levels per site. The purpose of this process is to ensure a seamless integration of <br />services when replacing an existing service provider or in-house program. <br />Goals: <br />1.Deliver seamless transition that provides step-by-step instruction for SFM operations. <br />2.Identify key resources for transition tasks and proposed operating model. <br />3.Create accountability for transition team members. <br />4.Host initial transition meeting with client representatives and SFM executive management team. <br />5.Create a base of communication and expected protocols between SFM and client. <br />6.Timely commencement and successful service implementation. <br />Site Assessments: The SFMtransition team will meet with key members of each location and conduct <br />an initial site assessment. The scope of work includes various aspects such as safety and security <br />regulations, time frequencies, waste disposal systems, and high traffic areas that require special <br />attention. In addition, SFM will also determine project work budgets to ensure efficient planning and <br />execution.Our Risk & Safety Managerwill conductsite assessments in order to develop training <br />programs for all employees. <br />Equipment: Equipment, chemicals, and other supplies will be distributed based on the need of each <br />location.. SFM followsa standardizedcompanywide cleaning program which includes(4) basic green <br />sealed certified chemicalsas well as supplies that will be utilized at every location. More information on <br />these products can be found in section “Equipment, Chemicals, & Products”of our proposal. <br />Transition Meetings:Regularly scheduled meetings will be held between SFM transition team and the <br />customer’s designated representative(s) during the initial transition to ensure the required level of <br />service is being reached consistently. Typical meetings are 30 days prior, 15 days after start up, 30 days, <br />60 days, and 90 days. <br />Staffing: Our Team’s primary objective is to make it as easy and convenient as possible for the existing <br />staff to join our Team. The transition team will facilitate the hiring of all qualified incumbent employees. <br />Once staffing levels are established, SFM will utilize its own forces to carry out the scope of work. Initial <br />training will include understanding of the newscope of workcontract expectations. <br />Page 57 of 111 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.