|
TOTALS:22560809 Projects $213,134,171
<br />OWNER ENGINEER CONTRACT DESCRIPTION FINAL AMOUNT
<br />COM-
<br />PLETED
<br />YEAR
<br />On TimeTime ExtContact
<br />Person
<br />Phone
<br />No.
<br />Fax
<br />No.E-MailMIAMI DADE WATER & SEWER 300 ENGINEERING
<br />DB for Installation of a 36" sanitary
<br />sewer FM along NW107th Ave from NW
<br />7-25th st
<br />Design Build of New 36" Force
<br />main $10,000,000.00 2023 Juan Curiel
<br />CITY OF HOLLWOOD 30" RAW WATER MAIN REPAIR
<br />replacement of 30 inch cast
<br />iron raw water main to 24 inch
<br />ductile iron raw water main.
<br />$257,800.00 2022
<br />Wilhelmina
<br />Montero (954) 921-3930 ######
<br />WMONTERO@hol
<br />lywoodfl.org
<br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS Emergency Point Repair of 8"
<br />gravity sewer $170,570.80 2022 Rodney
<br />Santana (305) 885-6400
<br />rodney.carrero-
<br />santana@snubbs.c
<br />om
<br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS Emergency repair of Pump
<br />Station $92,193.06 2021 Rodney
<br />Santana (305) 885-6400
<br />rodney.carrero-
<br />santana@snubbs.c
<br />om
<br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS
<br />Repair of 2 broken laterasl &
<br />perform Point repair of 8"
<br />gravity sewer
<br />$224,696.91 2021 Rodney
<br />Santana (305) 885-6400
<br />rodney.carrero-
<br />santana@snubbs.c
<br />om
<br />BROWARD COUNTY THOMPSON & ASSOCIATES Reclaimed Water Transmission Main BP
<br />1
<br />New 42" reclaimed water main
<br />installed $23,472,575.95 2021 MICHAEL
<br />HAGERTY (954) 731-3217 MHAGERTY@BR
<br />OWARD.ORG
<br />BROWARD COUNTY THOMPSON & ASSOCIATES Reclaimed Water Transmission Main BP
<br />2
<br />New 24" reclaimed watet main
<br />installed $3,765,092.91 2021 MICHAEL
<br />HAGERTY (954) 731-3217 MHAGERTY@BR
<br />OWARD.ORG
<br />Broward County Chen Moore and Associates Utility Analysis Zone 113B
<br />Neighborhood Improv. Proj.
<br />with, WM, San. Sewer, FM,
<br />Pump Sta. demo & install,
<br />landscape & roadway
<br />restoration.
<br />$28,115,925.82 2021 Jeff Clark (954) 831-0934
<br />jclark@broward.
<br />org
<br />City Of Boynton Beach Wantman Group
<br />Central Seacrest Corridor Utility
<br />Improvements Phase II
<br />Improvments of Water Mains
<br />and Drainage Utilities $12,560,787.18 2020 Joe Paterniti (561) 751-6423
<br />PaternitiJ@bbfl.u
<br />s
<br />Miami Dade Water and Sewer
<br />Department Ty LIN South Miami Heights Phase B
<br />Design Build Services for
<br />Replacement of Water Mains
<br />and service conversions in the
<br />south miami heights area
<br />Phase B
<br />$15,732,076.54 2020 Alex Valdes (786) 299-9008
<br />alexis.valdes@mia
<br />midade.gov
<br />Miami Dade Water and Sewer
<br />Department Ty LIN South Miami Heights Phase A
<br />Design Build WM and
<br />service conversions $15,683,712.17 2018 Y Y Alex Valdes (786) 299-9008
<br />Alexis.valdes@
<br />miamidade.gov
<br />City of Sunrise Arcadis
<br />Springtree Water/Waste Water
<br />Treatment Plant off-site
<br />Drainage & Utilities
<br />Improvement
<br />Improvments of Water
<br />Mains and Drainage
<br />Utilities
<br />$2,100,000.00 2018 Y Y Tim Welch 954-888-6055
<br />954-
<br />846-
<br />7404
<br />TWelch@sunri
<br />sefl.gov
<br />City of Coral Gables Coastal System
<br />International, Inc.
<br />Miracle Mile & Giralda Avenue
<br />Streetscape
<br />Drainage, roadway, &
<br />streetscape
<br />improvements,
<br />decorative pavers,
<br />fountain restorations,
<br />extensive landscaping,
<br />decorative street
<br />lighting, decorative
<br />street furniture and way
<br />finding signage.
<br />$24,462,288.00 2018 Y Y Ernesto Pino 305-460-5001 epino@coralgables
<br />.com
<br />SUNNY ISLES Stantec Pedestrian Bridge Pedestrian Bridge $1,869,887.24 2017 Y Y Bill Evans 305-792-1900
<br />bevans@sibfl.n
<br />et
<br />CITY OF CAPE CORAL Tetra Tech
<br />SW 6 & 7 Utilities Expansion
<br />Project CONTRACT II - NORTH
<br />CENTRAL AREA 3
<br />ITB UT13-02/TM-B
<br />2 San P.S. - 5,560 ft of
<br />15"-30" Pipe - Eliptical
<br />pipe - 39,810' of 6"-8"
<br />WM - 43,790' of 4"-16"
<br />Irrig - 41,110' of 8"-24"
<br />San - 5,620' of 4"-12" FM
<br />- Roadway, Electrical ,
<br />Grassing
<br />$11,096,384.00 2017 Y Y
<br />Paul
<br />Clinghan 239-574-0464 0
<br />pclingha@cape
<br />coral.net
<br />City of Sunrise ARCADIS
<br />Golf Village Water Main
<br />Improvements NIP - Water $5,526,762.00 2017 Y Y Tim Welch 954-888-6055
<br />954-
<br />846-
<br />7404
<br />TWelch@sunri
<br />sefl.gov
<br />City of Oakland Park Thompson and Associates
<br />Garden Acres Industrial Area Sanitary
<br />Sewer System
<br />Design Build SAN Sewer
<br />with Grinder PS & WM $699,960.95 2017 Y Y Marlon Loban 305-453-5804
<br />954-
<br />229-
<br />0422
<br />0
<br />MDWSD
<br />4900 LeJeune Rd
<br />Coral Gables, FL
<br />MIAMI-DADE W&S DEPT.54-Inch Water Main
<br />Transmission Line - Red Road
<br />Worked on FDOT ROW,
<br />had to close Grattiny
<br />Expressway to complete
<br />the work.
<br />$1,914,400.65 2017 Y Y
<br />Nelson
<br />Cespedes (786) 552-8142
<br />305-
<br />607-
<br />0799
<br />NCESP@mia
<br />midade.gov
<br />CITY OF MIAMI BEACH
<br />CITY HALL
<br />1700 CONVENTION CTR DRIVE
<br />MIAMI BEACH, FL 33139
<br />Chen-Moore and Associates Sunset 3&4
<br />Neighborhood
<br />Improvement Project
<br />including sanitary lining,
<br />drainage, water, and
<br />roadway improvements
<br /> $ 10,910,593.00 2016 Mina Samadi 305-673-7071
<br />305-
<br />673-
<br />7073
<br />minasamadi@mi
<br />amibeachfl.gov
<br />Ric-Man International, Inc.
<br />COMPLETED PROJECT IN THE LAST 10 YEARS
<br />Contact Information
<br />MOT
<br />F= Freeway
<br />H= Highway
<br />A= Arterial
<br />C= Collector
<br />L= Local
<br />https://ricmanus.sharepoint.com/sites/Bid/Shared Documents/CURRENT-COMPLETED WORK -06-2019 (All Projects).xlsmCompleted Work 1 of 2
|