Laserfiche WebLink
TOTALS:22560809 Projects $213,134,171 <br />OWNER ENGINEER CONTRACT DESCRIPTION FINAL AMOUNT <br />COM- <br />PLETED <br />YEAR <br />On TimeTime ExtContact <br />Person <br />Phone <br />No. <br />Fax <br />No.E-MailMIAMI DADE WATER & SEWER 300 ENGINEERING <br />DB for Installation of a 36" sanitary <br />sewer FM along NW107th Ave from NW <br />7-25th st <br />Design Build of New 36" Force <br />main $10,000,000.00 2023 Juan Curiel <br />CITY OF HOLLWOOD 30" RAW WATER MAIN REPAIR <br />replacement of 30 inch cast <br />iron raw water main to 24 inch <br />ductile iron raw water main. <br />$257,800.00 2022 <br />Wilhelmina <br />Montero (954) 921-3930 ###### <br />WMONTERO@hol <br />lywoodfl.org <br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS Emergency Point Repair of 8" <br />gravity sewer $170,570.80 2022 Rodney <br />Santana (305) 885-6400 <br />rodney.carrero- <br />santana@snubbs.c <br />om <br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS Emergency repair of Pump <br />Station $92,193.06 2021 Rodney <br />Santana (305) 885-6400 <br />rodney.carrero- <br />santana@snubbs.c <br />om <br />TOWN OF MEDLEY SNUBBS CONSULTING 2020 GENERAL UTILITY REPAIRS <br />Repair of 2 broken laterasl & <br />perform Point repair of 8" <br />gravity sewer <br />$224,696.91 2021 Rodney <br />Santana (305) 885-6400 <br />rodney.carrero- <br />santana@snubbs.c <br />om <br />BROWARD COUNTY THOMPSON & ASSOCIATES Reclaimed Water Transmission Main BP <br />1 <br />New 42" reclaimed water main <br />installed $23,472,575.95 2021 MICHAEL <br />HAGERTY (954) 731-3217 MHAGERTY@BR <br />OWARD.ORG <br />BROWARD COUNTY THOMPSON & ASSOCIATES Reclaimed Water Transmission Main BP <br />2 <br />New 24" reclaimed watet main <br />installed $3,765,092.91 2021 MICHAEL <br />HAGERTY (954) 731-3217 MHAGERTY@BR <br />OWARD.ORG <br />Broward County Chen Moore and Associates Utility Analysis Zone 113B <br />Neighborhood Improv. Proj. <br />with, WM, San. Sewer, FM, <br />Pump Sta. demo & install, <br />landscape & roadway <br />restoration. <br />$28,115,925.82 2021 Jeff Clark (954) 831-0934 <br />jclark@broward. <br />org <br />City Of Boynton Beach Wantman Group <br />Central Seacrest Corridor Utility <br />Improvements Phase II <br />Improvments of Water Mains <br />and Drainage Utilities $12,560,787.18 2020 Joe Paterniti (561) 751-6423 <br />PaternitiJ@bbfl.u <br />s <br />Miami Dade Water and Sewer <br />Department Ty LIN South Miami Heights Phase B <br />Design Build Services for <br />Replacement of Water Mains <br />and service conversions in the <br />south miami heights area <br />Phase B <br />$15,732,076.54 2020 Alex Valdes (786) 299-9008 <br />alexis.valdes@mia <br />midade.gov <br />Miami Dade Water and Sewer <br />Department Ty LIN South Miami Heights Phase A <br />Design Build WM and <br />service conversions $15,683,712.17 2018 Y Y Alex Valdes (786) 299-9008 <br />Alexis.valdes@ <br />miamidade.gov <br />City of Sunrise Arcadis <br />Springtree Water/Waste Water <br />Treatment Plant off-site <br />Drainage & Utilities <br />Improvement <br />Improvments of Water <br />Mains and Drainage <br />Utilities <br />$2,100,000.00 2018 Y Y Tim Welch 954-888-6055 <br />954- <br />846- <br />7404 <br />TWelch@sunri <br />sefl.gov <br />City of Coral Gables Coastal System <br />International, Inc. <br />Miracle Mile & Giralda Avenue <br />Streetscape <br />Drainage, roadway, & <br />streetscape <br />improvements, <br />decorative pavers, <br />fountain restorations, <br />extensive landscaping, <br />decorative street <br />lighting, decorative <br />street furniture and way <br />finding signage. <br />$24,462,288.00 2018 Y Y Ernesto Pino 305-460-5001 epino@coralgables <br />.com <br />SUNNY ISLES Stantec Pedestrian Bridge Pedestrian Bridge $1,869,887.24 2017 Y Y Bill Evans 305-792-1900 <br />bevans@sibfl.n <br />et <br />CITY OF CAPE CORAL Tetra Tech <br />SW 6 & 7 Utilities Expansion <br />Project CONTRACT II - NORTH <br />CENTRAL AREA 3 <br />ITB UT13-02/TM-B <br />2 San P.S. - 5,560 ft of <br />15"-30" Pipe - Eliptical <br />pipe - 39,810' of 6"-8" <br />WM - 43,790' of 4"-16" <br />Irrig - 41,110' of 8"-24" <br />San - 5,620' of 4"-12" FM <br />- Roadway, Electrical , <br />Grassing <br />$11,096,384.00 2017 Y Y <br />Paul <br />Clinghan 239-574-0464 0 <br />pclingha@cape <br />coral.net <br />City of Sunrise ARCADIS <br />Golf Village Water Main <br />Improvements NIP - Water $5,526,762.00 2017 Y Y Tim Welch 954-888-6055 <br />954- <br />846- <br />7404 <br />TWelch@sunri <br />sefl.gov <br />City of Oakland Park Thompson and Associates <br />Garden Acres Industrial Area Sanitary <br />Sewer System <br />Design Build SAN Sewer <br />with Grinder PS & WM $699,960.95 2017 Y Y Marlon Loban 305-453-5804 <br />954- <br />229- <br />0422 <br />0 <br />MDWSD <br />4900 LeJeune Rd <br />Coral Gables, FL <br />MIAMI-DADE W&S DEPT.54-Inch Water Main <br />Transmission Line - Red Road <br />Worked on FDOT ROW, <br />had to close Grattiny <br />Expressway to complete <br />the work. <br />$1,914,400.65 2017 Y Y <br />Nelson <br />Cespedes (786) 552-8142 <br />305- <br />607- <br />0799 <br />NCESP@mia <br />midade.gov <br />CITY OF MIAMI BEACH <br />CITY HALL <br />1700 CONVENTION CTR DRIVE <br />MIAMI BEACH, FL 33139 <br />Chen-Moore and Associates Sunset 3&4 <br />Neighborhood <br />Improvement Project <br />including sanitary lining, <br />drainage, water, and <br />roadway improvements <br /> $ 10,910,593.00 2016 Mina Samadi 305-673-7071 <br />305- <br />673- <br />7073 <br />minasamadi@mi <br />amibeachfl.gov <br />Ric-Man International, Inc. <br />COMPLETED PROJECT IN THE LAST 10 YEARS <br />Contact Information <br />MOT <br />F= Freeway <br />H= Highway <br />A= Arterial <br />C= Collector <br />L= Local <br />https://ricmanus.sharepoint.com/sites/Bid/Shared Documents/CURRENT-COMPLETED WORK -06-2019 (All Projects).xlsmCompleted Work 1 of 2