|
OWNER ENGINEER CONTRACT DESCRIPTION FINAL AMOUNT
<br />COM-
<br />PLETED
<br />YEAR
<br />On TimeTime ExtContact
<br />Person
<br />Phone
<br />No.
<br />Fax
<br />No.E-MailL= Local
<br />CITY OF MIAMI BEACH
<br />CITY HALL
<br />1700 CONVENTION CTR DRIVE
<br />MIAMI BEACH, FL 33139
<br />Lower North Bay Road
<br />5890' of 8"&10" WM and
<br />15" to 42" Drainage and 10
<br />Wells
<br />$1,762,799.37 2016 Y Y #N/A
<br />954-
<br />771-
<br />0298
<br />#N/A
<br />MDWSD
<br />4900 LeJeune Rd
<br />Coral Gables, FL
<br />MIAMI-DADE W&S DEPT.
<br />Emergency 36-Inch Force Main
<br />connection to 72-Inch
<br />Transmission Line
<br />Pipe was at a stage of
<br />colapsing. We had to
<br />coordinate with FDOT
<br />the partial closure of
<br />Biscayne Blvd.
<br />$413,568.00 2016 Y Y
<br />Nelson
<br />Cespedes (786) 552-8142
<br />305-
<br />607-
<br />0799
<br />NCESP@mia
<br />midade.gov
<br />MDWSD
<br />4900 LeJeune Rd
<br />Coral Gables, FL
<br />MIAMI-DADE W&S DEPT.
<br />EMERGENCY INSTALLATION
<br />OF TWO (2) 54-INCH
<br />BUTTERFLY VALVES
<br />LOCATED AT WEST
<br />4TH AVENUE (RED
<br />ROAD) AND WEST 83RD
<br />STREET AND WEST
<br />2ND AVENUE AND
<br />WEST 13TH STREET
<br /> $ 727,865.85 2016 Y Y
<br />Nelson
<br />Cespedes (786) 552-8142
<br />305-
<br />607-
<br />0799
<br />NCESP@miam
<br />idade.gov
<br />Broward County WWSS Broward County WWSS Twin Lakes
<br />Neighborhood
<br />Improvement. San Sewer,
<br />Lift Station and Drainage
<br />$4,032,144.45 2015 Najla Elshami
<br />Zerrouki, P.E.(954) 831-0791
<br />(954)
<br />831-
<br />0789
<br />NELSHAMI@bro
<br />ward.org
<br />MDWSD
<br />4900 LeJeune Rd
<br />Coral Gables, FL
<br />MIAMI-DADE W&S DEPT.
<br />EMERGENCY INSTALLATION
<br />OF 16: SEWER ON BISCAYNE
<br />BLVD & NW 36TH ST
<br />BISCAYNE BLVD & NW
<br />36TH ST $438,000.00 2015 Y Y
<br />Nelson
<br />Cespedes (786) 552-8142
<br />305-
<br />607-
<br />0799
<br />NCESP@miam
<br />idade.gov
<br />City of West Palm Beach MATHEWS CONSULTING
<br />MONCEAUX ROAD GROUP 1
<br />DRAINAGE & UTILITY
<br />IMPROVEMENT PROJECT
<br />Drainage: 3,700' ,
<br />Sanitary:3,180' , W
<br />Mains: 4,040,
<br />Landscaping, Lighting,
<br />Markings and Roadways
<br />$3,265,695.95 2015 Y Y
<br />TRACY
<br />WARD (561) 494-1103 TWARD@WPB.O
<br />RG
<br />DOT / MDWSD APCTE / STANTEC
<br />Section 5 Project 48-Inch PCCP -
<br />NW 2nd Ave from NW 8th St thru
<br />NW 12 St For
<br />Condotte/Community/Demoya
<br />Joint Venture
<br />48-Inch PCCP
<br />Installation $521,573.48 2015 Y Y
<br />Larry
<br />Goodwin/
<br />Pedro Vigil
<br />786-295-3754 /
<br />305-205-5152
<br />GOODWIN@
<br />miamidade.go
<br />v /
<br />vigilp@miamid
<br />ade.gov
<br />City of Oakland Park CTA Oakland Park 38th Street
<br />Drainage and
<br />Streetscape
<br />improvement
<br />$3,398,578.35 2015 Y Y
<br />Ron
<br />Desbrunes 954-630-4482
<br />954-
<br />229-
<br />0422
<br />0
<br />City of Sunny Isles Various
<br />Piggy Back
<br />Emergency Corrections
<br />Emergency Corrections
<br />/ Improvements
<br />Sanitary, Drainage, etc
<br />$1,292,562.95 2015 Y Y Bill Evans 786-350-8190 0
<br />bevans@sibfl.n
<br />et
<br />City of Weston Calvin, Giordano
<br /> & Assoc Weston Drainage Improvements 60" - 15" Drainage 9,021 $2,468,879.91 2014 Y Y
<br />Karl C.
<br />Thompson,
<br />PE
<br />954-385-2600
<br />954-
<br />385-
<br />2610
<br />Kthompson@west
<br />onfl.org
<br />City of Weston Calvin, Giordano
<br /> & Assoc
<br />ITDD Weston Force Main
<br />Improvements 16" Forcemain 8,500 $1,611,657.59 2014 Y Y
<br />Karl C.
<br />Thompson,
<br />PE
<br />954-385-2600
<br />954-
<br />385-
<br />2610
<br />Kthompson@west
<br />onfl.org
<br />PBC Utilities Department Keshavarz & Assoc. Inc
<br />Belvedere Homes Infrastructure
<br />Improvements Phase 2
<br />Infrastructure
<br />improvements including
<br />10k' 8" PVC WM, 8k'
<br />PVC Vac SAN, 3k' 15"-
<br />42" RCP SW
<br />$3,164,725.80 2014 Y Y
<br />Joseph
<br />Tanacredi 561-493-6088
<br />561-
<br />493-
<br />6085
<br />jtanacredi@pbc
<br />water.com
<br />TOWN OF SURFSIDE Calvin, Giordano
<br /> & Assoc
<br />11-Surf
<br />INFRASTRUCTURE REHAB
<br />W Mains, San Sewer,
<br />Storm Sewer, 2 San PS,
<br />3 Storm PS, 9 Wells
<br />$18,292,287.92 2014 Y N Bill Evans 786-350-8190 0
<br />bevans@sibfl.n
<br />et
<br />BROWARD COUNTY WATER
<br />& WASTE ENGINEERING
<br />DIVISION
<br />2555 W COPANS ROAD
<br />POMPANO BEACH, FL 33069
<br />BROWARD COUNTY
<br />WATER &
<br />WASTE ENGINEERING
<br />DIVISION
<br />2555 W COPANS ROAD
<br />POMPANO BEACH, FL
<br />33069
<br />1B2 Water Main Improvement 9,029' of 6"-16" WM $1,012,867.10 2014 Y N Greg Balicki 954-831-0903
<br />(954)
<br />831-
<br />0798
<br />0
<br />City of Oakland Park
<br />3650 NE 12th Ave
<br />Oakland Park, FL 33334
<br />Craven Thompson &
<br />Associates
<br />3563 NW 53rd. St.
<br />Ft. Lauderdale, FL 33309
<br />12-Oakw
<br />BID PACK 3 WATER MAIN
<br />IMPROVEMENTS
<br />1496 lf of 15" RCP
<br />6" & 8" DIP & FPVC
<br />Water Mains
<br />$2,075,256.90 2014
<br />John
<br />Perez 954-630-4475
<br />954-
<br />229-
<br />0422
<br />johnmp@oakla
<br />ndparkfl.gov
<br />https://ricmanus.sharepoint.com/sites/Bid/Shared Documents/CURRENT-COMPLETED WORK -06-2019 (All Projects).xlsmCompleted Work 2 of 2
|