My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclaimed Water Transmission Main <br />Deerfield Beach, Florida <br />ROLE Ric-Man International served as the prime contractor <br />DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The Work included installation of new reclaimed water pipes through open cut and/or <br />horizontal directional drilling, fittings, valves, master meter, restoration of pavement, <br />milling and restoration, lining of existing pipe, and all ancillary work required to <br />complete the project satisfactory to the County. Location extended from the North <br />Regional Wastewater Treatment Plant along Powerline Road, SW 10th Street, Quiet <br />Waters Park, Hillsboro Blvd, and NW 39th Avenue to Hillsboro Canal. <br />OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Broward County WWS <br />Michael Hagerty <br />954-731-3217 <br />Mhagerty@broward.org <br />2555 W. Copans Rd <br />Pompano Beach, FL 33069 <br />GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres G. Diaz- General Manager <br />Michael Jankowski - Project Manager <br />Luis Hernandez - Superintendent <br />CONSTRUCTION COST <br />FINAL COST <br />COMPLETION DATE <br />$23,474,575.95 <br />$ <br />2021 <br />CONSTRUCTION DETAILS <br />SCOPE OF WORK WATER MAIN <br />Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />No <br />Yes <br />New Reclaimed Water <br />Main <br />Water Meters Connected <br />Fire Hydrants <br />30,564 LF OF 24" - 42" DIP <br />Open Cut & 1211 LF of 42" <br />Via HDD <br />0 <br />0 <br />STREETSCAPE STORMWATER DRAINAGE <br />Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />200 <br />No <br />No <br />No <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br />0 <br />ROADWAY SANITARY SEWER <br />Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />49,000 SY <br />13750 SY <br />No <br />24,000 SY <br />Sanitary Manholes <br />Sanitary Sewer Main <br />Sewer Pip Bursting <br />Sewer Pump Stations <br />Force Main <br />0 <br />0 <br />0 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.