My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />Reclaimed Water Transmission Main Bid Package 2 <br />Coconut Creek, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The work included installation of new reclaimed water pipes through open cut, fittings, <br />valves, master meter, restoration of South Florida Water Management District (SFWMD) <br />canal right-of-way, restoration of pavement, milling and restoration and all ancillary <br />work required to complete the project. Located at the north end of NW 39th Avenue at <br />the Hillsboro Canal and continues west within the SFWMD canal right-of-way and ends <br />at the intersection of North University Drive and the Hillsboro Canal. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Broward County WWS <br />Michael Hagerty <br />954-731-3217 <br />Mhagerty@broward.org <br />2555 W. Copans Rd <br />Pompano Beach, FL 33069 <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres G. Diaz- General Manager <br />Michael Jankowski - Project Manager <br />Luis Hernandez - Superintendent <br /> <br /> <br /> CONSTRUCTION COST <br />FINAL COST <br />COMPLETION DATE <br />$ 3,765,092.91 <br />$ <br />2021 <br /> <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK RECLAIMED WATER MAIN <br /> Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />Yes <br />Yes <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Fire Hydrants <br />27,172 LF of 24" DIP <br />0 <br />0 <br />0 <br /> <br /> <br /> STREETSCAPE STORMWATER DRAINAGE <br /> Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />No <br />No <br />No <br />Yes <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br /> <br /> 0 <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />2400 SY <br />No <br />No <br />No <br />Sanitary Manholes <br />Sanitary Sewer Main <br />Sewer Pip Bursting <br />Sewer Pump Stations <br />Force Main <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.