My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Seacrest Corridor Utility Improvements- <br />Ph II <br />Boynton Beach, Florida <br />ROLE Ric-Man International served as the CMAR <br />DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The project includes but is not limited to pipe bursting potable water main <br />replacements, reclaimed water main extensions, a forcemain and stormwater system <br />upgrades, including landscape removal and relocation, exfiltration trench <br />installations, pavement overlay and miscellaneous upgrades to driveway aprons and <br />sidewalks. The project area is bordered on the north by the south right-of way line <br />S.W 4th Avenue, on the east by the FEC Railroad, on the south by Woolbright Road, <br />and on the west by Interstate 95. <br />OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />City of Boynton Beach <br />Joseph Paterniti, Utility Director <br />(561) 742-6423 <br />Paternitij@bbfl.us <br />124 E. Woolbright Rd <br />Boynton Beach, Fl 33435 <br />GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- General Manager <br />Russell Morris - Project Manager <br />Luis Hernandez – General Super <br />CONSTRUCTION COST <br />COMPLETION DATE <br />$12.5 million <br />2020 <br />CONSTRUCTION DETAILS <br />SCOPE OF WORK WATER MAIN <br />Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />Yes <br />No <br />700 <br />0 <br />New Water Main <br />Connected <br />Fire Hydrants <br />30,000 LF (20,000 Via <br />pipe bursting; 10,000 via <br />HDD <br />175 <br />700 <br />65 <br />STREETSCAPE STORMWATER DRAINAGE <br />Large Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />Yes <br />12,779 LF <br />196 LF <br />110 SY <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />11 <br />37 <br />3690 LF <br />0 <br />ROADWAY SANITARY SEWER <br />Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />Yes <br />No <br />Yes <br />Sanitary Manholes <br />Sanitary Force Main <br />Sewer Lining <br />Sewer Pump Stations <br />0 <br />4320 LF of 10 Inch <br />0 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.