Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />Monceaux Road Group I Drainage and Utility <br />Improvements Project <br />City of West Palm Beach, FL <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Storm water System improvements consisted of removal and replacement of the existing <br />storm water system infrastructure; including storm inlets, manholes, exfiltration trenches, <br />and other miscellaneous appurtenances. Responsible for all sheeting and shoring, <br />dewatering and all by-pass pumping of the storm sewer system. Water main <br />improvements consisted of grouting of the existing water main system (including removal <br />of the water services/meter boxes and fire hydrants) and replacement with a new 8" DIP <br />class 52 , cement lined water main system (Including water services, valves and fire <br />hydrants). Temporary 2" water mains and for all by-pass piping of the water main system. <br />Sanitary sewer improvements consisted of removal and replacing existing sanitary sewer <br />Infrastructure including manholes, laterals and cleanouts with 8" and 18" PVC SDR 26 <br />sewer mains, concrete manholes, and 6" PVC laterals with cleanouts. Roadway <br />construction consisted of removal and replacement of existing roadway, sidewalks, curbs, <br />and driveways within the right-of-way. MOT and access to all properties at all times. <br />Traffic signage and pavement markings conforming to city and FDOT standards <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />City of West Palm Beach <br />Tracy Ward, Project Manager <br />(561) 494-1103 <br />tward@wpb.org <br />401 Clematis Street <br />West Palm Beach, FL 33401 <br /> <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Rene Castillo, President <br />Andres Diaz, Project Manager <br />Guadalupe Guzman, Foreman <br /> <br /> <br /> CONSTRUCTION COST $3.3 million <br /> COMPLETION DATE January, 2016 <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />Conduit <br />Residences <br />Businesses <br />No <br />Yes <br />50 homes <br />10 businesses <br />Water Main <br />Fire Hydrants <br />Meters <br />Water Services <br /> 4,050 LF (3- to 8-inch DIP) <br />10 <br />52 <br />52 <br /> <br /> <br /> LIGHTING STORM DRAINAGE <br /> Conduit <br />Wire <br />Pull Boxes <br />Electrical service station <br /> <br /> <br />43,790 LF (4- to 16- Inch) <br />498 <br />844 <br />4- inch and 16-inch <br />Catch Basins <br />Drainage Mains <br />Exfiltration Trench <br /> <br />46 Inlets <br />2040 LF (15- to 48-inch RCP) <br />1660 LF (30- to 42- inch) <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Roadway Reconstruction <br />Sidewalk Reconstruction <br />Driveways <br />15,700 SY <br />5,460 SY <br />8,900 SY <br /> <br />Manholes <br />Sewer Main <br />Sanitary Laterals <br /> <br />15 <br />3180 LF (8- to 18- inch PVC) <br />78 single <br /> <br /> <br />