My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />BISCAYNE BLVD. 36” FORCMAIN CONNECTION TO 72” <br />TRANSMISSION LINE <br />Miami, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the Sub <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Installation of 36" Force Main, including concrete removal for encased wye, hazardous gas <br />inspection, flowable fill around wye, temporary paving markings, temporary restorations, <br />additional backfill, pipe bedding, touchup coating with 2 part epoxy and making connection <br />to provide a complete replacement. Exploration of 72" gravity sewer connection, and utility <br />investigation, including temporary restoration and soft dig. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Miami Dade Water & Sewer <br />Nelson Cespedes <br />(786)552-8142 <br />NCESP@miamidade.gov <br />4900 LeJeune Rd <br />Coral Gables, FL <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- Project Manager <br />Luis Hernandez – Superintendent <br />Michael Jankowski- Asst. Super. <br /> <br /> <br /> CONSTRUCTION COST <br />COMPLETION DATE <br />$413,568.00 <br />2016 <br /> <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />No <br />Yes <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Fire Hydrants <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> STREETSCAPE STORMWATER DRAINAGE <br /> Trees <br />Sidewalks <br />Driveways <br />Curb & Gutter <br />Decorative Pavers <br />No <br />No <br />No <br />No <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />No <br />No <br />Yes <br />Sanitary Manholes <br />Gravity Sewer <br />Sanitary Force Main <br /> <br />Sewer Lining <br />Sewer Pump Stations <br /> <br /> <br />1000 LF of 36” DIP with <br />Connection to a 72” <br />0 <br />0 <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.