My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> EMERGENCY INSTALLATION OF TWO (2) 54-INCH <br />BUTTERFLY VALVES LOCATED AT WEST 4TH AVENUE <br />(RED ROAD) AND WEST 83RD STREET AND WEST 2ND <br />AVENUE AND WEST 13TH STREET <br />Hialeah, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the Prime <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The Project, including mobilization and demobilization, consists of installation of one (1) 54 - <br />inch butterfly valve at West 2nd Avenue and south of West 14th Street and removal and <br />replacement of one(1) 54-inch butterfly valve at West 4th Avenue and West 83rd Street; <br />installation of Department furnished butterfly valves and adaptors; dewatering the main; <br />excavation; sodding, cleaning and disinfection; and other appurtenant and miscellaneous <br />items and work for a complete, satisfactory and functional installation of the project in <br />Miami-Dade County, Florida. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Miami Dade Water & Sewer <br />Nelson Cespedes <br />(786)552-8142 <br />NCESP@miamidade.gov <br />4900 LeJeune Rd <br />Coral Gables, FL <br /> <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- Project Manager <br />Luis Hernandez – Superintendent <br />Michael Jankowski- Asst. Super. <br /> <br /> <br /> CONSTRUCTION COST <br />COMPLETION DATE <br />$727,865.85 <br />2016 <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />No <br />Yes <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Butterfly Valves <br />0 <br />0 <br />0 <br />2 54-Inch Valves <br /> <br /> <br /> STREETSCAPE STORMWATER DRAINAGE <br /> Trees <br />Sidewalks <br />Driveways <br />Curb & Gutter <br />Decorative Pavers <br />No <br />No <br />No <br />No <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />No <br />No <br />Yes <br />Sanitary Manholes <br />Gravity Sewer <br />Sanitary Force Main <br />Sewer Lining <br />Sewer Pump Stations <br /> <br /> <br /> <br />0 <br />0 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.