My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cape Coral Area 3 Contract II Utilities Extension <br />Project <br />City of Cape Coral, Florida <br />ROLE Ric-Man International served as the prime contractor <br />DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The project consisted of potable water, irrigation, sanitary sewer, storm water drainage, <br />and hardscape infrastructure improvements to a neighborhood composed of 844 homes <br />and 2 bridges in Cape Coral, Florida. Potable water improvements included Installing <br />39,800 feet of 6- to 8- inch PVC water main with 438 services for 734 meters, 34 fire <br />hydrants, and an aerial crossing. Irrigation improvements included installing 43,790 feet <br />of reclaimed 4- to 16- inch irrigation mains with 498 irrigation services for 844 meters, as <br />well as a 4- inch and a 16- inch aerial crossing. Storm water drainage improvements <br />included installing, 5,200 feet of 15- to 36-Inch HDPE & PVC main, 400 feet of 12x18- to <br />24x38-Inch elliptical HDPE main, and 127 Inlet structures. Sanitary sewer improvements <br />Included installing 41,100 feet of 8-inch PVC gravity sewer mains up to 16-feet deep <br />including 98 manholes structures and 540 single and double services, 2 wastewater lift <br />stations, and 5,620 feet of force main. Hardscape and landscape improvements included <br />100,000 square yards of roadway reconstruction and hardscape restoration, 95,000 <br />square yards of swale reconstruction, and 11,700 square yards of driveways. <br />OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />City of Cape Coral <br />Paul Clingham, Project Manager <br />(239) 574-0464 <br />pclingha@capecoral.net <br />1015 Cultural Park Blvd <br />Cape Coral, FL 33990 <br />GENERAL CONTRACTOR Ric-Man International, Inc. <br />Rene Castillo, President <br />Andres Diaz, Project Manager <br />Luis Hernandez, Superintendent <br />CONSTRUCTION COST $9.7 million <br />COMPLETION DATE April, 2015 <br />CONSTRUCTION DETAILS <br />SCOPE OF WORK WATER MAIN <br />Design-Build Project <br />Conduit <br />Residences <br />Businesses <br />No <br />0 <br />844 homes <br />Water Main <br />Fire Hydrants <br />Meters <br />Water Services <br /> 39,800 LF (6-8 Inch PVC) <br />34 <br />734 <br />438 <br />IRRIGATION STORM DRAINAGE <br />Reclaimed <br />Services <br />Meters <br />Aerial Crossing <br />43,790 LF (4- to 16- Inch) <br />498 <br />844 <br />4- inch and 16-inch <br />Catch Basins <br />Drainage Mains <br />Elliptical HDPE main <br />127 Inlets <br />5,200 LF (15- to 36-inch HDPE <br />& PVC) <br />400 LF LF (12x18 to 24x38- <br />inch) <br />ROADWAY SANITARY SEWER <br />Roadway Reconstruction <br />Swale Reconstruction <br />Driveways <br />Bridges <br />100,000 SY <br />95,000 SY <br />11,700 SY <br />2 <br />Manholes <br />Sewer Main <br />Sanitary Laterals <br />Lift Stations <br />Forcemain <br />98 <br />41,100 LF (8” PVC) <br />540 single and double <br />2 <br />5,620 LF
The URL can be used to link to this page
Your browser does not support the video tag.