My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />City of Weston Drainage Improvements <br />City of Weston, FL <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />This neighborhood improvement project consisted of major storm water drainage <br />infrastructure Improvements to 12 separate locations throughout the City of Weston, <br />directly impacting over 1,400 residences and local businesses, specifically, replacing <br />existing drainage mains at 8 separate sites and large diameter c ulvert pipes connecting <br />canals beneath roads at 4 separate sites. Total drainage improvements include the <br />installation of 8,500 feet of 15- to 72-inch CAP and RCP drainage mains and 400 feet of <br />53x93-inch CAP and RCP elliptical drainage main up to 14 feet deep, as well as 73 inlets <br />and 34 manholes. Additional utility improvements included installing 60 feet of 8-inch <br />ductile iron water main and 50 feet of 8-to 10-inch PVC gravity sewer main. Streetscape <br />improvements included 15,900 square yards of milling and resurfacing, 800 square yards <br />of sidewalk and driveway restoration, and 850 feet of curb and gutter. Landscape <br />improvements included 15,000 square yards of swale reconstruction as well as protecting, <br />removing, or relocating 180 trees and setting 2 tons of riprap. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />City of Weston <br />John Flint, Project Manager <br />(954) 385-2000 <br />Jflint@westonfl.org <br />17200 Royal Palm Blvd <br />Weston, FL 33326 <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Rene Castillo, President <br />Andres Diaz, Project Manager <br />Michael Jankowski, Superintendent <br /> <br /> <br /> <br /> CONSTRUCTION COST $1.9 million <br /> COMPLETION DATE August 2014 <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK DRAINAGE <br /> Design-Build Project <br />Conduit <br />Residences <br />Businesses <br />No <br />No <br />1400 homes & businesses <br /> <br />Drainage Mains <br /> <br />Manholes <br />Inlets <br /> 9,000 LF (15-72- inch CAP & <br />RCP) <br />34 <br />73 <br />500 <br /> <br /> <br /> ROADWAY <br /> Milling & Resurfacing <br />Striping <br />16,000 SY <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.