My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />City of Weston Force Main Improvements <br />Project Areas 1, 3, 4, 5, and 6 <br />City of Weston, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />This neighborhood improvement project consisted of stormwater drainage force main and <br />streetscape improvements to 5 separate locations throughout the City of Weston, directly <br />impacting several businesses and a school. Stormwater drainage improvements included <br />the installation of 8,500 feet of 8- to 16-inch DIP force main and 15 48-inch manhole air- <br />release valve structures, work that required 280 feet of directional drilling and 2 bore pits. <br />Streetscape improvements included over14,000 square yards of milling & resurfacing, 270 <br />square yards of sidewalk restoration, and 350 feet of curb & gutter. Landscape <br />improvements included 7,800 square yards of swale reconstruction and 17,000 square <br />yards of swale restoration. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />City of Weston <br />John R. Flint, City Manager <br />(954) 385-2000 <br />jflint@westonfl.org <br />17200 Royal Palm Boulevard <br />Weston, Florida 33326 <br /> <br /> <br /> <br /> GENERAL CONTRACTOR <br />PERSONNEL <br />Ric-Man International, Inc. <br />Andres Diaz, Project Manager <br />Michael Jankowski, Superintendent <br /> <br /> <br /> PROJECT COST $2.1 million <br /> COMPLETION DATE October 2014 <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />N.I.P. <br />Schools <br />No <br />Yes <br />1 <br />Water Main <br />Water Services <br />Pump Station <br />0 <br />0 <br />0 <br /> <br /> <br /> STREETSCAPE STORMWATER FORCE MAIN <br /> Curb & Gutter <br />Sidewalk Restoration <br />350 LF <br />270 SY <br />Force Main <br />Directional Drill <br />Drainage Structures <br />Tapping Sleeves <br />8,540 LF (8-16” DIP) <br />280 LF <br />15 manhole air-release valve <br />9 (up to 16x30” DIP) <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Swale Restoration <br />14,100 SY <br />7,800 SY <br />17,000 SY <br />Sewer Main <br />Sanitary Structures <br />Pump Stations <br />0 <br />0 <br />0 <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.