My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PRIME PROPOSERS KEY TEAM <br /> <br />The success of any project lies in the effective implementation of a well devised <br />management plan. The technical qualifications and experience of the staff assigned <br />to the project must match the requirements of the project. Our staffing plan is <br />simple: to form a team of reputable, qualified professionals, with deep roots in our <br />community. The individuals included in our Staffing Chart have forged their careers <br />in the construction industry constructing neighborhood and streetscape projects in <br />South Florida. All our firms are local, and we have been here for many years and <br />intend to stay here. We make our living primarily from providing services to local <br />and state agencies including the Florida Department of Transportation (FDOT), the <br />Miami-Dade Expressway Authority (MDX) Miami-Dade County, Broward County, <br />and municipalities, including the City of Coral Gables. <br /> <br />Prime Proposer: <br />RMI has a proven 40-year track record of successfully completing projects. Over <br />those 40 years, RMI has successfully completed some of the most difficult public <br />infrastructure projects in South Florida more than $596 million, spanning over 40 <br />municipalities across South Florida. RMI is uniquely qualified to perform this work <br />due to its experience performing similar work in the City of Miami Beach, City of <br />Weston, City of Boynton Beach, City of West Palm Beach, and several <br />neighborhoods throughout Miami Dade and Broward County. Our experience <br />includes 36 design-build projects totaling $208 million, 55 urban infrastructure <br />projects totaling $317 million. <br /> <br />Due to the various Design/Build Projects that we have completed (36 Projects), we <br />have an extensive amount of experience in the Design & Permitting Phase. All of <br />our Design/Build Projects that have been completed included the following tasks: <br />30% Cost Estimates, 60% Cost Estimates, 100% Cost Estimates, Scheduling, Long <br />Lead Item Analysis, Constructability Reviews and Permitting. We have always <br />performed these tasks as a way of controlling our Design/Build Projects since we <br />have always been the Prime Contractor. We bring this experience to the City of <br />Sunny Isles and North Miam Beach that we can handle all Design Phase activities. <br />Furthermore, unlike many Construction Management firms, we can self-perform up <br />to 50% of the work which will allows us greater control over the schedule since we <br />would not be solely dependent on Subcontractors. <br /> <br />Our Team brings the following strengths to execute this job: <br /> <br />• Construction experience within different governmental agencies in South <br />Florida such as: Indian River, St. Lucie, Martin, Palm Beach, Broward, Miami- <br />Dade and Monroe Counties on Utility and Streetscape projects.
The URL can be used to link to this page
Your browser does not support the video tag.