Laserfiche WebLink
<br /> <br />MICHAEL JANKOWSKI <br />PRESIDENT <br />EXPERIENCE <br />Mr. Jankowski has 14 years of <br />construction management experience <br />since 2009. In Southeast Florida, he has <br />worked with municipalities from Miami‐ <br />Dade to Palm Beach County and has <br />been instrumental in the completion of <br />major infrastructure improvement and <br />neighborhood improvement projects. <br />His responsibilities include coordinating <br />construction activities with outside <br />agencies, reviewing contractual <br />requirements to meet client’s <br />expectations, coordination of <br />maintenance of traffic throughout <br />construction phases, conducting field <br />inspections of water and drainage <br />systems, documenting field change to <br />the design, assisting in processing and <br />obtaining permits, reviewing and <br />updating construction project schedule, <br />and working closely with Public <br />Information Officers in disseminating the <br />project schedule to residents and <br />businesses <br />EDUCATION <br />• Lynn University – Boca Raton, FL <br />• Bachelor of Science in Business <br />Management – 2011 <br />• Studied Infrastructure in Rome, Italy – <br />2010 <br />OSHA 3015 Excavation, Trenching and <br />Soil Mechanics <br />OSHA 10 Hour Training <br />PROJECT EXPERIENCE <br />Project: 30 Inch Raw Water Main Repair <br />Owner: City of Hollywood- $257,800.00 <br />Role: General Manager <br />The work performed consists of the replacement of 30-inch cast <br />iron raw water main to 24-inch ductile iron raw water main. <br /> <br />Project: 60-INCH Force Main (NL-1A) (West Segment) Along NW <br />162ND Street From NW 6th Ave to N.E. 8th Ave <br />Owner: Miami Dade Water & Sewer- $19,314,785.95 <br />Role: Project Manager/President <br />The scope of work includes, but is not limited to, the furnishing and <br />installation of approximately 10,000 linear feet of 60- inch <br />PCCP with T-Lock lining, including the corresponding fittings and <br />valves; connection to existing 72-inch PCCP slip-lined with 63” <br />HDPE force main at intersection of NW 159th Street and NW 6th <br />Avenue and connection to a proposed 60-inch PCCP force main <br />(being constructed by others under Contract No. S-944) at NE 161st <br />St and NE 8th Ave and leaving a stub out for future <br />connection at NW 162nd Street and NW 2nd Avenue; furnishing and <br />installing Automatic Air Release Valves; furnishing and <br />installing required 60-inch Flanged Plug valves; valve access <br />manholes; access manholes; temporary pavement installation and <br />removal; pavement restoration, surface and sodding restoration; tree <br />relocations; pavement markings restoration; MOT and public <br />outreach coordination <br /> <br />Project: 60-Inch Force Main (NL-1A) Between the Intersections of <br />NE 151 St & Biscayne Blvd and NE 163 ST & NE 8 Ave <br />Owner: Miami Dade Water & Sewer- $25,527,995.49 <br />Role: Project Manager/President <br />The scope of work includes, but is not limited to, the furnishing and <br />installation of approximately 12,500 linear feet of 60-inch PCCP, <br />including the corresponding fittings and valves; microtunnel <br />installation at NE 151st Street and Biscayne Boulevard including two <br />(2) 30-feet deep shafts, and approximately 600 linear feet of 84-inch <br />steel casing and 60-inch PCCP; approximately 200 linear feet of 84- <br />inch steel casing and 60-inch PCCP at FEC Right-of-Way; furnishing <br />and installing one (1) 72-inch by 60-inch tapping saddle and one (1) <br />60-inch tapping valve required to make a tapping connection to an <br />existing 72-inch force main at NE 151 Street east of Biscayne <br />Boulevard; furnishing and installing six (6) Air Release Valves and <br />fifteen (15) Automatic Air Release Valves; furnishing and installing <br />six (6) 60-inch Flanged Plug valves; relocation of approximately 1,400 <br />linear feet of 12-inch ductile iron water main including one(1) fire <br />hydrant assembly; furnishing and installing approximately 270 linear <br />feet of 16-inch force main; furnishing and installation of 28 access <br />manholes; furnishing and installation of approximately 50 feet of 18- <br />inch HDPE storm drainage pipe, approximately 50 feet of exfiltration <br />trench and 2 storm inlets <br /> <br />Project: Roadway Improvements to NW 107th Avenue from NW