Laserfiche WebLink
<br /> <br />138th Street to NW 166th Street <br />Owner: Miami Dade Water & Sewer- <br />$23,325,575.00 <br />Role: Project Manager/President <br />The work includes all design and construction <br />services necessary to perform roadway <br />construction of a roadway with a typical section <br />that consists of a five (5) lane undivided roadway <br />facility with intermittent left turn lanes, continuous <br />stormwater system, sidewalks, curb and gutters, <br />pavement markings, signage, signalization, <br />lighting, and landscaping on NW 107 Avenue from <br />NW 138 Street to NW 166 Street. The work also <br />includes all design and construction services <br />necessary to construct a canal along the west side <br />of the NW 107 Avenue project limits as well as the <br />design and installation of a water main and sewer <br />main as well as all appurtenances. <br /> <br />DB Services of 36- inch Diameter Sanitary Sewer <br />FM Along NW 107th Ave <br />Role: Superintendent <br />The project consists of replacing the existing 24- <br />inch force main on NW 107 Ave from south of NW <br />7 street to NW 25 street with a new 36-inch force <br />main into the existing force main system in order <br />to reduce system operating pressures and increase <br />system capacity within the area <br /> <br />Project: Reclaimed Water Transmission Main Bid <br />Package 2 <br />Owner: Broward County WWS <br />Reference: <br />Role: Vice President <br />The work included installation of 27,172 LF of new <br />24” reclaimed water pipes through open cut, <br />fittings, valves, master meter, restoration of South <br />Florida Water Management District (SFWMD) canal <br />right-of-way, restoration of pavement, milling and <br />restoration and all ancillary work required to <br />complete the project. Located at the north end of <br />NW 39th Avenue at the Hillsboro Canal and <br />continues west within the SFWMD canal right-of- <br />way and ends at the intersection of North <br />University Drive and the Hillsboro Canal <br /> <br />Reclaimed Water Transmission Main <br />Owner: Broward County WWS <br />Reference: <br />Role: Vice President <br />The Work included installation of 31,000 24” to 42” <br />lf of new reclaimed water pipes through open cut <br />and/or horizontal directional drilling, fittings, <br />valves, master meter, restoration of pavement, <br />milling and restoration, lining of existing pipe, and <br />all ancillary work required to complete the project <br />satisfactory to the County. Location extended from <br />the North Regional Wastewater Treatment Plant <br />along Powerline Road, SW 10th Street, Quiet <br />Waters Park, Hillsboro Blvd, and NW 39th Avenue <br />to Hillsboro Canal <br /> <br />Utility analysis Zone 113B <br />Owner: Broward County WWSS – 28.1 million <br />Reference: Alan Garcia, PWD Director ‐ 954‐831‐ <br />0903 <br />Role: Vice President <br />The project consisted of the furnishing of all labor, <br />materials, equipment, services and incidentals for <br />the construction of the infrastructure site work. The <br />work will include site preparation, earthwork, <br />sanitary sewer system installation (38,100 LF of 8- <br />18” PVC), water systems installation (59,820 LF of <br />DIP 6-16”) (940 LF of 6-12” HDD) (440 services), <br />roadway and walkway restoration and <br />construction, landscape restoration, restoring <br />existing irrigation systems, pavement marking <br />restoration and site furnishings an intercoastal <br />waterway crossing Partial roadway reconstruction <br />of failing existing roadway 75,000 SY of existing <br />roadway milling and resurfacing New sidewalk and <br />driveway apron construction <br /> <br />D/B Central Seacrest Corridor Utility <br />Improvements Ph 2 <br />Owner: City of Boynton Beach- $12.5 million <br />Reference: Joe Paterniti 561-751-6423 <br />Role: Vice President <br />City of Boynton Beach Project – Design Build <br />Installation of over 30,000 LF of new 8” watermain <br />and fire hydrants via Pipe Bursting Installation of <br />700+ new water service meters. Construction of <br />over 80,000 SY of drainage swales and new <br />landscaping Installation of 5,000 LF of new 10” <br />force-main including an intercoastal waterway <br />crossing Partial roadway reconstruction of failing <br />existing roadway 75,000 SY of existing roadway <br />milling and resurfacing New sidewalk and <br />driveway apron construction throughout the <br />neighborhood <br /> <br />Springtree WWTP On-Site & Off-Site Drainage & <br />Utilities Improvements <br />Owner: City of Sunrise - $2.8 million <br />Reference: Tim Welch 954-888-6055 <br />Role: Vice President <br />Installation of over 1,500 LF of Drainage pipe and <br />structures up to 42” in Dia. Installation of 2,500 LF