<br />
<br />of new 8” watermain and hydrants Installation of
<br />1,000 LF of new Reclaim water force-main ranging
<br />from 6” to 16” in Dia. Full pavement and roadway
<br />reconstruction Lake expansion and outfall
<br />installation Safe disposal of over 1,600 CY of
<br />contaminated soil Completed 3 months ahead of
<br />schedule.
<br />
<br />South Miami Heights Phase A D/B
<br />Owner: Miami Dade water and sewer - $17.9
<br />million
<br />Reference: Alexis Valdez 786-299-9008
<br />Role: Project Manager
<br />Scope of work included the surveying,
<br />geotechnical investigations, locating existing
<br />utilities, engineering and design work, technical
<br />specifications, permitting and construction of
<br />approximately 63,336 linear feet of 8-inch ductile
<br />iron water main pipe and fittings; 8,421 linear feet
<br />of 12-inch ductile iron water main pipe and fittings;
<br />4,327 linear feet of 16-inch ductile iron water main
<br />pipe and fittings; and 5,550 linear feet of 6-inch
<br />ductile iron water main pipe and fittings. As well as
<br />fire hydrant assemblies, approximately 664 dual
<br />water services and approximately 40 single water
<br />services with approximately 1,368 water service
<br />conversions from rear to front. The project location
<br />for Phase A is the area bounded by S.W. 168 Street.
<br />to the north, S.W. 184 Street. to the south, S.W. 122
<br />Avenue to the west, and S.W. 115 Avenue to the
<br />east
<br />
<br />South Miami Heights Phase B D/B
<br />Owner: Miami Dade water and sewer - $15.7
<br />million
<br />Reference: Alexis Valdez 786-299-9008
<br />Role: Project Manager
<br />Scope of work included the surveying,
<br />geotechnical investigations, locating existing
<br />utilities, engineering and design work, technical
<br />specifications, permitting and construction of
<br />approximately 63,928 linear feet of 8-inch ductile
<br />iron water main pipe and fittings; 8,371 linear feet
<br />of 12-inch ductile iron water main pipe and fittings;
<br />3,217 linear feet of 16-inch ductile iron water main
<br />pipe and fittings; and 500 linear feet of 6-inch
<br />ductile iron water main pipe and fittings. As well as
<br />fire hydrant assemblies, approximately 664 dual
<br />water services and approximately 40 single water
<br />services with approximately 1,022 water service
<br />conversions from rear to front. The project location
<br />for Phase A is the area bounded by S.W. 168 Street.
<br />to the north, S.W. 184 Street. to the south, S.W. 122
<br />Avenue to the west, and S.W. 115 Avenue to the
<br />east
<br />
<br />D/B Neighborhood No. 8: Central Bayshore South
<br />Right-of-Way Infrastructure Improvements
<br />Owner: City of Miami Beach - $18 million
<br />Role: Asst. Super
<br />Installation of over 10,000 ft of DIP WM
<br />Installation of 20,000 ft of new storm water system,
<br />including pumping stations and outfalls
<br />Pavement restoration and traffic mediation
<br />systems
<br />
<br />Project: Miracle Mile/Giralda Ave Streetscape
<br />CMAR
<br />Owner: City of Coral Gables
<br />Reference: Peter Iglesias
<br />Construction Cost: $21 million (2016-2018)
<br />Role: Assistant Superintendent
<br />Construction of new curb, gutter, drainage, and
<br />other infrastructure assessment and
<br />improvements along both sides of the full length of
<br />Miracle Mile. Street improvements including
<br />paving, striping and signage. Street design
<br />included a restructuring of on-street parking from
<br />diagonal to parallel. Widening of existing
<br />sidewalks including ADA accessible ramps, expand
<br />sidewalk design, sidewalk elements and mid-block
<br />mini parks. Installation of ornamental lights and
<br />pedestrian lighting. New landscaping, tress,
<br />groundcover and irrigation
<br />
<br />FDOT SR 823/NW 57TH AVE/RED ROAD
<br />Owner: FDOT/MDWASD – $20,865,766.28
<br />Reference: Nelson Cespedes 305-607-0799
<br />Role: Asst. Super
<br />Project mainly consisted of the installation of 4,848
<br />feet of 54-inch bar-pipe through Red Road,
<br />including crossing an existing 48-inch Forcemain
<br />(installed by us in 2004). As part of the work, we
<br />had to install the new main through the
<br />intersection of Opa-Locka Blvd/ NW138 St, and Red
<br />Road. Given our past performance with FDOT we
<br />were able to guarantee completing the crossing
<br />during a weekend. Despite some challenges, we
<br />were able to keep our promise. Traffic was restored
<br />by Sunday afternoon
<br />
<br />Project: DERM01‐WASD‐NLE‐WEST 54" PCCP
<br />Force Main
<br />Owner: Miami‐Dade Water & Sewer Department
<br />Reference: Nelson Cespedes ‐ 786‐552‐8142
<br />Construction Cost: $6,649,092 ‐ 2005 (9,100 LF of
<br />54"PCCP)
<br />Role: Asst. Super.
|