Laserfiche WebLink
<br /> <br />Utility Analysis Zone 113B <br />Owner: Broward County WWSS – $28,115,925.52 <br />Reference: Alan Garcia, PWD Director ‐ 954‐831‐ <br />0903 <br />Role: Project Manager <br />The project consisted of the furnishing of all labor, <br />materials, equipment, services and incidentals for <br />the construction of the infrastructure site work. The <br />work will include site preparation, earthwork, <br />sanitary sewer system installation (38,100 LF of 8- <br />18” PVC), water systems installation (59,820 LF of <br />DIP 6-16”) (940 LF of 6-12” HDD) (440 services), <br />roadway and walkway restoration and <br />construction, landscape restoration, restoring <br />existing irrigation systems, pavement marking <br />restoration and site furnishings <br /> <br />Miracle Mile/Giralda Ave Streetscape CMAR <br />Owner: City of Coral Gables - $21 million <br />Reference: Peter Iglesias <br />Role: Project Manager <br />Construction of new curb, gutter, drainage, and <br />other infrastructure assessment and <br />improvements along both sides of the full length of <br />Miracle Mile. Street improvements including <br />paving, striping and signage. Street design <br />included a restructuring of on-street parking from <br />diagonal to parallel. Widening of existing <br />sidewalks including ADA accessible ramps, expand <br />sidewalk design, sidewalk elements and mid-block <br />mini parks. Installation of ornamental lights and <br />pedestrian lighting. New landscaping, tress, <br />groundcover and irrigation <br /> <br />South Miami Heights – Phase A D/B <br />Owner: MDWASD – $17,953,664.33 <br />Reference: Alexis Valdes 786-268-5322 <br />Role: Project Manager <br />Scope of work included the surveying, <br />geotechnical investigations, locating existing <br />utilities, engineering and design work, technical <br />specifications, permitting and construction of <br />approximately 63,336 linear feet of 8-inch ductile <br />iron water main pipe and fittings; 8,421 linear feet <br />of 12-inch ductile iron water main pipe and fittings; <br />4,327 linear feet of 16-inch ductile iron water main <br />pipe and fittings; and 5,550 linear feet of 6-inch <br />ductile iron water main pipe and fittings. As well as <br />fire hydrant assemblies, approximately 664 dual <br />water services and approximately 40 single water <br />services with approximately 1,368 water service <br />conversions from rear to front <br /> <br /> <br />South Miami Heights Phase B D/B <br />Owner: Miami Dade water and sewer - $15.7 <br />million <br />Reference: Alexis Valdez 786-299-9008 <br />Role: Project Manager <br />Scope of work included the surveying, <br />geotechnical investigations, locating existing <br />utilities, engineering and design work, technical <br />specifications, permitting and construction of <br />approximately 63,928 linear feet of 8-inch ductile <br />iron water main pipe and fittings; 8,371 linear feet <br />of 12-inch ductile iron water main pipe and fittings; <br />3,217 linear feet of 16-inch ductile iron water main <br />pipe and fittings; and 500 linear feet of 6-inch <br />ductile iron water main pipe and fittings. As well as <br />fire hydrant assemblies, approximately 664 dual <br />water services and approximately 40 single water <br />services with approximately 1,022 water service <br />conversions from rear to front. The project location <br />for Phase A is the area bounded by S.W. 168 Street. <br />to the north, S.W. 184 Street. to the south, S.W. 122 <br />Avenue to the west, and S.W. 115 Avenue to the <br />east <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />