<br />Utility Analysis Zone 113B
<br />Owner: Broward County WWSS – $28,115,925.52
<br />Reference: Alan Garcia, PWD Director ‐ 954‐831‐
<br />0903
<br />Role: Project Manager
<br />The project consisted of the furnishing of all labor,
<br />materials, equipment, services and incidentals for
<br />the construction of the infrastructure site work. The
<br />work will include site preparation, earthwork,
<br />sanitary sewer system installation (38,100 LF of 8-
<br />18” PVC), water systems installation (59,820 LF of
<br />DIP 6-16”) (940 LF of 6-12” HDD) (440 services),
<br />roadway and walkway restoration and
<br />construction, landscape restoration, restoring
<br />existing irrigation systems, pavement marking
<br />restoration and site furnishings
<br />
<br />Miracle Mile/Giralda Ave Streetscape CMAR
<br />Owner: City of Coral Gables - $21 million
<br />Reference: Peter Iglesias
<br />Role: Project Manager
<br />Construction of new curb, gutter, drainage, and
<br />other infrastructure assessment and
<br />improvements along both sides of the full length of
<br />Miracle Mile. Street improvements including
<br />paving, striping and signage. Street design
<br />included a restructuring of on-street parking from
<br />diagonal to parallel. Widening of existing
<br />sidewalks including ADA accessible ramps, expand
<br />sidewalk design, sidewalk elements and mid-block
<br />mini parks. Installation of ornamental lights and
<br />pedestrian lighting. New landscaping, tress,
<br />groundcover and irrigation
<br />
<br />South Miami Heights – Phase A D/B
<br />Owner: MDWASD – $17,953,664.33
<br />Reference: Alexis Valdes 786-268-5322
<br />Role: Project Manager
<br />Scope of work included the surveying,
<br />geotechnical investigations, locating existing
<br />utilities, engineering and design work, technical
<br />specifications, permitting and construction of
<br />approximately 63,336 linear feet of 8-inch ductile
<br />iron water main pipe and fittings; 8,421 linear feet
<br />of 12-inch ductile iron water main pipe and fittings;
<br />4,327 linear feet of 16-inch ductile iron water main
<br />pipe and fittings; and 5,550 linear feet of 6-inch
<br />ductile iron water main pipe and fittings. As well as
<br />fire hydrant assemblies, approximately 664 dual
<br />water services and approximately 40 single water
<br />services with approximately 1,368 water service
<br />conversions from rear to front
<br />
<br />
<br />South Miami Heights Phase B D/B
<br />Owner: Miami Dade water and sewer - $15.7
<br />million
<br />Reference: Alexis Valdez 786-299-9008
<br />Role: Project Manager
<br />Scope of work included the surveying,
<br />geotechnical investigations, locating existing
<br />utilities, engineering and design work, technical
<br />specifications, permitting and construction of
<br />approximately 63,928 linear feet of 8-inch ductile
<br />iron water main pipe and fittings; 8,371 linear feet
<br />of 12-inch ductile iron water main pipe and fittings;
<br />3,217 linear feet of 16-inch ductile iron water main
<br />pipe and fittings; and 500 linear feet of 6-inch
<br />ductile iron water main pipe and fittings. As well as
<br />fire hydrant assemblies, approximately 664 dual
<br />water services and approximately 40 single water
<br />services with approximately 1,022 water service
<br />conversions from rear to front. The project location
<br />for Phase A is the area bounded by S.W. 168 Street.
<br />to the north, S.W. 184 Street. to the south, S.W. 122
<br />Avenue to the west, and S.W. 115 Avenue to the
<br />east
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
|