Laserfiche WebLink
<br /> <br />stations. Approximately $16 million budget <br /> <br />D/B Central Seacrest Corridor Utility <br />Improvements Phase 2 <br />Owner: City of Boynton Beach <br />Reference: Joe Paterniti 561-751-6423 <br />Construction Cost: $12.5 million ‐ 2019 <br />Role: Project Coordinator <br />The project includes but is not limited to potable <br />water main replacements, reclaimed water main <br />extensions, a force main and stormwater system <br />upgrades, including landscape removal and <br />relocation, exfiltration trench installations, <br />pavement overlay and miscellaneous upgrades to <br />driveway aprons and sidewalks. <br /> <br />Springtree Water/Wastewater Treatment Plant <br />Off-Site Drainage and Utilities Improvements <br />Owner: City of Sunrise <br />Reference: Tim Welch 954-888-6055 <br />Construction Cost: $1,859,054.10-2019 <br />Role: Project Coordinator <br />Installation of new 8-inch potable water main <br />connecting to the existing plant loop and <br />extending along N.W. 44th Street east to the <br />adjacent high school. Overall drainage <br />improvements to the plant and neighboring golf <br />course to the south that will include the filling of <br />existing detention areas, a lake expansion, and <br />the construction of a conveyance system between <br />the two sites. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />