Laserfiche WebLink
Qty <br />Pay Item No. <br />Description <br />Unit <br />Price <br />ITEM 30C -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />SY <br />$ <br />17.79 <br />ITEM 30C -B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />15.41 <br />D) <br />Metal Shingles <br />ITEM 30D -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />17.79 <br />ITEM 30D -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />15.41 <br />ITEM 31 <br />Furnish all materials, labor, and equipment for the replacement of deteriorated wood substrates <br />- <br />A) <br />618- inch CDX Plywood . <br />ITEM 31A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />5.34 <br />ITEM 31A -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />4.15 <br />B) <br />2 -inches x 6 -Inch T&G Wood(Fir) <br />ITEM 31 B -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />11.86 <br />Curved Roof <br />S.F <br />$ <br />11.86 <br />ITEM 31 B -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />9.49 <br />Curved Roof <br />S.F <br />$ <br />9.49 <br />ITEM 32 <br />Furnish all materials, labor, and equipment to install the underlayment materials. <br />A) <br />6 Mil Polyethylene Sheet <br />ITEM 32A -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />0.59 <br />ITEM 32A -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />0.47 <br />B) <br />30 Lbs. Felts Saturated Organic . <br />ITEM 3213-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />2.37 <br />ITEM 326-13 <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />2.96 <br />C) <br />Self -Adhering underlayment granular face sheet. 55 Mils. Fiberglass mat reinforced and SBS <br />asphalt <br />ITEM 32C -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />4.74 <br />ITEM 32C -B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />4.15 <br />D) <br />Self -Adhering underlayment polyethylene sheet. 40 Mils. Slip resisting polythene film. <br />ITEM 32D -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />5.93 <br />ITEM 32D -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />5.34 <br />E) <br />Self- Adhering sheet underlayment, high temperature sheet. 40 Mils, with slip resisting <br />polyethylene to surface laminated to SBS modified asphalt adhesive <br />ITEM 32E -A <br />Small Roof Repair Areas -0 S.17-500 S.F <br />SY <br />$ <br />5.93 <br />ITEM 32E -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />5.34 <br />F)' <br />Slip sheet building' paper. 5 lbs/100 S.F rosin sized <br />ITEM 32F -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />0.59 <br />ITEM 32F -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />0.30 <br />ITEM 33 <br />Furnish all materials, labor, and equipment to install pressure treated blocking. <br />A) <br />2x4 <br />ITEM 33A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />5.93 <br />ITEM 33A -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />4.74 <br />B)- <br />2x6 <br />ITEM 336-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />7.11 <br />ITEM 3313-13 <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />5.93 <br />C) <br />2X8 <br />ITEM 33C -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />11.86 <br />ITEM 33C -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />SY <br />$ <br />9.49 <br />ITEM 34 <br />Furnish all materials, labor, and equipment to install sheet metal flashings and trim. <br />A) <br />24 Gauge Stainless Steel Drip Edge- 4Inch Profile <br />ITEM 34A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />$ <br />14.23 <br />ITEM 34A -B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />L.F <br />$ <br />11.86 <br />ITEM 35 <br />Furnish all materials, labor, and equipment to install metal gutter. <br />A) <br />6 -inch x 6 -Inch 24 Gauge Galvanized Steel Gutter <br />ITEM 35A -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />L.F <br />$ <br />29.64 <br />ITEM 35A -B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />L.F <br />$ <br />23.72 <br />B), <br />6 -Inch x 6 -inch Aluminum Gutter <br />ITEM 35A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />$ <br />32.02 <br />ITEM 35A -B <br />Medium to Large Roof Repair Area -501 SY and Up <br />L.F <br />$ <br />26.09 <br />ITEM 36 <br />Furnish all materials, labor and equipment to install rigid standard ridge vent, high density <br />polypropylene or UV -Stabilized plastic <br />ITEM 36-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />L.F <br />$ <br />11.86 <br />ITEM 36-B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />L.F <br />$ <br />9.49 <br />ITEM 37 <br />Furnish all materials, labor and equipment to install glass fiber reinforced asphalt shingles, <br />mineral -granular surfaced self-sealing. <br />ITEM 37-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />4.74 <br />ITEM 37-B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />4.15 <br />ITEM 38 <br />Furnish all materials, labor, and equipment to install 20 oz. <br />Copper shingles 34 -inches x 12 -inches, 2 clips per panel. <br />ITEM 38-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />17.79 <br />ITEM 38-B <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />17.79 <br />