My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3636
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:22:10 AM
Creation date
3/28/2024 12:41:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3636
Date ā(mm/dd/yyyy)ā
03/21/2024
Description
Agreement w/ Advanced Roofing, Inc. for Citywide Emergency Roof Inspection, Maintenance, & Repair Sevices as-needed basis.
Supplemental fields
Expiration Date
3/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qty <br />Pay Item No. <br />Description <br />Unit <br />Price <br />ITEM 39 <br />Furnish all materials, labor.and equipment to install galvanized steel sheet, .0276 inch with <br />siliconized pol ester coating <br />A) <br />Standing Seam <br />ITEM 39A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />18.97 <br />ITEM 39A-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />17.79 <br />B) <br />Batten Seam <br />ITEM 3913-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />11.86 <br />ITEM 396-13 <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />10.67 <br />ITEM 40 <br />Furnish all materials, labor, and equipment to install aluminum sheet, coil coated alloy, .040 <br />Inch with siliconized polyester coating. <br />A)' <br />Standing Seam - <br />ITEM 40A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />20.16 <br />ITEM 40A-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />18.97 <br />B) <br />Batten Seam <br />ITEM 40B -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />13.04 <br />ITEM 406-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />11.86 <br />C) <br />Flat Seam <br />ITEM 40C -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />13.04 <br />ITEM 40C-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />11.86 <br />D) <br />Ridge Metal Building Roofing (Through Metal Building Manufacturer) <br />ITEM 40D -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />14.23 <br />ITEM 40D-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />11.86 <br />ITEM 41 <br />Furnish all materials, labor, and equipment to install clay roof tile. <br />A) <br />Spanish"S" Tile <br />ITEM 41A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />13.04 <br />ITEM 41A-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />SY <br />$ <br />11.86 <br />B) <br />Barrel Tile <br />ITEM 41A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />SY <br />$ <br />13.04 <br />ITEM 41A-13 <br />Medium to Large Roof Repair Area -501 S.F and Up <br />SY <br />$ <br />11.86 <br />ITEM 42 <br />Furnish all materials, labor and equipment to install 4" diameter leader <br />A) <br />24 Gauge Galvanized Steel <br />ITEM 42A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />9.49 <br />ITEM 42A-13 <br />Medium to Large Roof Repair Area -501 S.F and Up <br />S.F <br />$ <br />8.30 <br />B) <br />Anodized Aluminium <br />ITEM 4213-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />10.67 <br />ITEM 426-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />9.49 <br />C) <br />24 Gauge Stainless Steel <br />ITEM 42C -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />13.04 <br />ITEM 42C-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />11.86 <br />ITEM 43 <br />Furnish all materials, labor and equipment to install concrete roof the <br />A) <br />Spanish"Sā Tile <br />ITEM 43A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />$ <br />11.86 <br />ITEM 43A-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />10.67 <br />B) <br />Flat Shingle <br />ITEM 4313-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />$ <br />10.67 <br />ITEM 436-13 <br />Medium to Large Roof Repair Area -501 SY and Up <br />S.F <br />$ <br />10.08 <br />ITEM 44 <br />Supplies not listed or included elsewhere MAY be purchased under this contract on a strictly <br />COST-PLUS arrangement only. Documentation of vendor cost must be provided with v,vritten <br />(City) estimates. Provide percent markup. City staff estimates approximately $25,000 worth of <br />this type of material will be required per year. <br />EA. <br />ITEM 45 <br />Crane Rental ALLOWANCE - based upon receipts and as authorized by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.