Laserfiche WebLink
Second <br />Renewal <br />Qty <br />Pay Item No. <br />Description <br />Unit <br />6% Increase <br />ITEM 7 <br />ITEM 1-A <br />Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos <br />containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance <br />with the asbestos test laboratory survey report recommendations provided by the City. This <br />allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement <br />and it does not include any incidental costs. The proposed cost for asbestos abatement shall be <br />approved prior to performing the work. A copy of the receipt is required for payment. <br />1 <br />0.00 <br />ITEM 1-13 <br />ALLOWANCE for Permits. Contractor markup and overhead is disallwoed. Payment shall be based on <br />actual bona fide receipts <br />1 <br />3,680.32 <br />ITEM 2 <br />Furnish all materials, labor, and equipment for exisitng roof tear -off, including existing <br />insulation board down to substrate. This item also includes all disposal costs. <br />ITEM 2-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />5.75 <br />ITEM 2-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />4.60 <br />ITEM 2-13 <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />3.45 <br />ITEM 3 <br />Furnish all materials, labor, and equipment to install approved isotherm or polyisocyanurate <br />rigid insulation board tapered, based on 11/2 inches thickness, fully attached to substrate. <br />A) <br />MOPPED IN: <br />ITEM 3A -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />4.60 <br />ITEM 3A -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />4.03 <br />ITEM 3A -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.88 <br />B) <br />MECHANICALLY ATTACHED <br />ITEM 3B -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />5.75 <br />ITEM 3B -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />4.03 <br />ITEM 313-B <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.88 <br />ITEM 4 <br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with <br />2 -ply base fl shina, anchor sheet with vent sheet without insulation. <br />ITEM 4-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />10.35 <br />ITEM 4-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />4.60 <br />ITEM 4-C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.88 <br />ITEM 5 <br />Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with <br />2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications). <br />A) <br />MOPPED IN: <br />ITEM 5A -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />8.05 <br />ITEM 5A -B <br />Medium Roof Repair/Replacement Areas -501 SX -110,000S.17 <br />S.F <br />4.60 <br />ITEM 5A -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.30 <br />B) <br />MECHANICALLY ATTACHED <br />ITEM 5B -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />9.20 <br />ITEM 513-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />5.75 <br />ITEM 5B -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />3.45 <br />C) <br />TORCHED DOWN ATTACHED: <br />ITEM 5C -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />13.80 <br />ITEM 5C -B <br />Medium Roof Repair/Replacement Areas -601 S.F-101000 S.F <br />S.F <br />4.60 <br />ITEM 5C -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.88 <br />D) <br />ALUMINIUM ROOF COATING(FOR REFLECTIVITY FOR BLACK ROOF SYSTEMS(SRI 68 MIN.): <br />Such as'a och" premium rubberized aluminium roof coating) <br />ITEM 5D -A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />9.20 <br />ITEM 51D-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />4.31 <br />ITEM 5D -C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />S.F <br />2.88 <br />ITEM 6 <br />Furnish all materials, labor, and equipment to install approved cents, 11/2 inches thickness by 3% <br />inches wide. <br />ITEM 6-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />L.F <br />5.75 <br />ITEM 6-13 <br />Medium Roof Repair/Replacement Areas -601 S.17-101000 S.F <br />L.F <br />1.15 <br />ITEM 6-C <br />Large Roof Repair/Replacement Areas -Over 109001 S.F <br />L.F <br />0.58 <br />ITEM 7 <br />Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches <br />wide. <br />ITEM 7-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />L.F <br />23.00 <br />ITEM 7-13 <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />23.00 <br />ITEM 7-C <br />Large Roof Repair/Replacement Areas -Over 10,001 S.F <br />L.F <br />17.25 <br />ITEM 8 <br />Furnish all materials, labor, and equipmentto install built-up roof repair/replacement, including <br />ea gravel protection. <br />ITEM 8-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />S.F <br />11.50 <br />ITEM 8-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />2.30 <br />ITEM 9 <br />Furnish all materials, labor, and equipment to install built-up roof pea gravel. <br />