Laserfiche WebLink
ITEM 9-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />S.F <br />11.50 <br />ITEM 9-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />S.F <br />3.45 <br />ITEM 10 <br />Furnish all materials, labor, and equipment to install wall sheet metal flashing, 24 -gauge <br />stainless steel 8 inches wide. <br />ITEM 10-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />13.80 <br />ITEM 10-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />11.50 <br />ITEM 10-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />9.78 <br />ITEM 11 <br />Furnish all materials, labor and equipment to install continuous 4 -inches metal drip edge <br />A) <br />24 Gauge Galvanized Steel <br />ITEM 11A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />20.70 <br />ITEM 11A -B <br />Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F <br />L.F <br />17.25 <br />ITEM 11A -C <br />Large Roof Repair/ReplacementAreas -Over 10,001 SY <br />L.F <br />11.50 <br />B) <br />24 Gauge Stainless Steel <br />ITEM 11 B -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />21.85 <br />ITEM 11 B -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />18.40 <br />ITEM 11 BOC <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />12.65 <br />C) <br />Copper <br />ITEM 11C -A <br />Small Roof Repair Areas -0 S.17-500 SY <br />L.F <br />21.85 <br />ITEM 11C -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000S.F <br />L.F <br />18.40 <br />ITEM 11 C -C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />12.65 <br />D) <br />Aluminum <br />ITEM 11 D -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />21.85 <br />ITEM 11 D -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />18.40 <br />ITEM 11 D -C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />12.65 <br />ITEM 12 <br />Furnish all materials, labor and equipment to install wall counter flashing 24 -gauge stainless <br />steel, surface mounted with springs lock reglet and 24 -gauge stainless steel flashing, 6 inches <br />vertical. <br />ITEM 12-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />23.00 <br />ITEM 12-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />20.70 <br />ITEM 12-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />17.25 <br />ITEM 13 <br />Furnish all material, labor and equipment to install metal coping cap, snap-lok system, 8 -inches <br />wide. <br />A) <br />24 Gauge Galvanized Steel <br />ITEM 13A -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />24.15 <br />ITEM 13A -B <br />Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F <br />L.F <br />21.85 <br />ITEM 13A -C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />18.40 <br />B) <br />24 Gauge Stainless Steel <br />ITEM 136-A <br />Small Roof Repair Areas -0 S.F-500 S.F <br />L.F <br />25.30 <br />ITEM 13B -B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY <br />L.F <br />23.00 <br />ITEM 1313-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />19.55 <br />C) <br />Aluminum with Kynar Finish <br />ITEM 13C -A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />25.30 <br />ITEM 13C -B <br />Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F <br />L.F <br />23.00 <br />ITEM 13C -C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />19.55 <br />ITEM 14 <br />Furnish all materials, labor and equipment to install pipe mounting pedestals(4), with equipment <br />rail(3 feet x3 feet and flashina, 18 inches high. <br />EA <br />862.58 <br />ITEM 15 <br />Furnish all materials, labor and equipment to install pitch pocket, for 6 -inch diameter vertical <br />element. <br />EA <br />201.27 <br />ITEM 16 <br />Furnish all materials, labor and equipment to install pipe or duct mountin roof pedestal, 18 <br />au a galvanised steel complete with flashing, 12 inches hi h. <br />EA <br />316.28 <br />ITEM 17 <br />Furnish all materials, labor, and equipment to Install roof penetration flashings, stainless <br />steel 26 GA., with sealant cover, for vertical 6 -inch diameter element, 9 inches high, umbrella <br />type. <br />EA. <br />230.02 <br />ITEM 18 <br />Furnish all materials, labor, and equipment to install 12 inches high, 3 feet wide x 3 feet long, <br />roof equipment support curbs, 1'/Z inches thick 3 lbs., rigid insulation, 18 GA., Galvanized steel <br />shell base plate and fully mitered 3 inches cant <br />FA. <br />517.55 <br />ITEM 19 <br />Furnish all materials, labor, and equipment to install rubber boot flashings for vertical round <br />penetrations, typically vent stacks, 4-6 inches diameter, 8 inches high, complete with stainless <br />steel clamps. <br />EA. <br />86.26 <br />ITEM 20 <br />Furnish all materials, labor, and equipment to install 6 -inch roof drains, standard dura -coated <br />cast iron, steel inserts with strainer, and clamps (by Zum, or City approved equal). <br />FA. <br />1,380.12 <br />ITEM 21 <br />Furnish all materials, labor, and equipment to install expansion joint cover, without blocking. <br />0.00 <br />ITEM 21-A <br />Small Roof Repair Areas -0 S.F-500 SY <br />L.F <br />34.50 <br />ITEM 21-B <br />Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F <br />L.F <br />28.75 <br />ITEM 21-C <br />Large Roof Repair/Replacement Areas -Over 10,001 SY <br />L.F <br />23.00 <br />ITEM 22 <br />Furnish all materials, labor, and equipment to install plumbing vent flashing, lead sleeve and <br />coupling, installed 4 -inch pipe <br />EA <br />86.26 <br />ITEM 23 <br />Furnish all materials, labor, and equipment to install 8 inches high x 16 inches wide metal <br />scupper, 4 sided with inte ral drip strip and surface re let flashing. <br />ITEM 23-A <br />24 Gauge Galvanized Steel <br />EA. <br />172.52 <br />ITEM 23-B <br />124 Gauge Stainless Steel <br />FA. <br />345.03 <br />ITEM 24 <br />1 Furnish all materials, labor, and equipment to install 6 -inch diameter leader. <br />