Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />Any addenda or other modifications to the Documents will be made in writing, and issued <br />by the City, prior to the time and date of Bid Opening. Such written addenda or <br />modifications shall be part of the Documents and shall be binding upon each Bidder. No <br />verbal addenda or modifications shall be allowed nor shall any Bidder rely upon any verbal <br />addenda or modifications in preparing or submitting its bid. <br />3.4 EXECUTION OF BID <br />Bid must contain an original signature of an authorized representative of the company in <br />the space provided. Failure to sign the bid shall invalidate it, and it will not be accepted. <br />All bids must be completed in ink or typewritten. No erasures are permitted. If a correction <br />is necessary, the bidder should draw a single line through the entered figure and enter the <br />corrected figure above it. Corrections should be initialed by the person signing the bid, or <br />a duly authorized representative of the firm submitting bid. Any illegible entries, pencil bids <br />or corrections not initialed may not be accepted. Only corrections that show the clear intent <br />of the bidder, in the sole discretion of the City of Sunrise, will be accepted. <br />3.5 NO BID <br />If not submitting a bid, respond by returning the "STATEMENT OF NO BID" Schedule G of <br />this Invitation for Bid. Repeated failure to respond without sufficient justification may be <br />cause from removal of a Bidder's name from future solicitations. <br />3.6 PRE-BID CONFERENCE <br />Not applicable for this bid. <br />3.7 PRICES BID <br />List both the unit price and the extended total, if applicable. Prices must be stated in the <br />units specified on the Bid Sheet. In case of a discrepancy in computing the amount of the <br />bid between the unit price bid and the extended total, the unit price will govern. When bids <br />are awarded on the basis of Lump Sum, if there is a discrepancy between the written and <br />numeric amount, the written amount prevails. <br />3.8 F.O.B. POINT <br />All bid prices shall be F.O.B. destination freight prepaid and delivered by Vendor to the <br />City's specified location(s). <br />3.9 BID VALIDITY <br />All bids shall remain valid for ninety (90) days after the time of bid opening. After this time <br />period the Bidder may request the Bid be withdrawn. <br />3.10 DELIVERY / COMPLETION TIME / RESPONSE TIME <br />Work shall commence within 30 calendar days of the date of Notice to Proceed or after <br />receipt of purchase order. If specified response time cannot be met, show number of days <br />required to respond after receipt of Purchase Order or release order in space provided on <br />the Bid Sheet. Response time may become a basis for making an award. Response shall <br />be within the normal working hours of the user, Monday through Friday, excluding City <br />holidays <br />The delivery of the goods and /or services within the time specified is of the essence in this <br />procurement. The City shall have the right to cancel any or all items(s) without obligation if <br />Revised 6/27/18 Page 33 <br />