Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR <br />ITEM 1: <br />BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />A) Prior to Contractor beginning any other work at the site, <br />Contractor shall remove the asbestos containing material using <br />a licensed asbestos abatement Contractor. Removal shall be in <br />accordance with the asbestos test laboratory survey report <br />recommendations provided by the City. This allowance is to <br />reimburse the Contractor for the actual cost incurred from <br />asbestos abatement and it does not include any incidental costs. <br />The proposed cost for asbestos abatement shall be approved <br />prior to performing the work. A copy of the receipt is required <br />for payment. <br />ALLOWANCE <br />B) ALLOWANCE for Permits. Contractor markup and overhead is <br />disallowed. Payment shall be based on actual bona fide receipts. <br />ALLOWANCE <br />ITEM 2: Furnish all materials, labor, and equipment for existing roof tear - <br />off, including existing insulation board, down to substrate. This <br />item also includes all disposal costs. <br />$ 20,000.00 <br />TOTAL <br />$ 10,000.00 <br />TOTAL <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: 121 Locations = 500 S.F@ $ /S. F. _ $ <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. - 10,000 S.F. <br />Approximately. (2) Locations = 7,500 SY @ $ /S. F. _$ <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: f:L Locations = 25, 000 S.F @ $ /S. F. <br />ITEM 3: Furnish all materials, labor, and equipment to install approved <br />isotherm or polyisocyanurate rigid insulation board tapered, <br />based on 1 %2 inches thickness, fully attached to substrate. <br />A) Mopped in: <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 500 S.F(& $ /S. F. _ $ <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: (2) Locations = 7,500 SY @ $ /S. F. _$ <br />TOTAL <br />TOTAL <br />TOTAL <br />TOTAL <br />TOTAL <br />Revised 6/27/18 Page 48 <br />