Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ /L.F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: Locations = 200 LY @ $ /L. F. _ $ <br />TOTAL <br />D) Aluminum <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately. 2) Locations = 25 L.F@ $ /L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. - 10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ <br />TOTAL <br />ITEM 12: Furnish all materials, labor, and equipment to install wall counter <br />flashing 24 -gauge stainless steel, surface mounted with spring <br />lock reglet and 24 -gauge stainless steel flashing, 6- inches <br />vertical. <br />a) <br />Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F(&, $ <br />/L. F. _ $ <br />TOTAL <br />b) <br />Medium Roof Repair/Replacement areas. <br />501 S.F. - 10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />c) <br />Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 L.F @ $ <br />/L. F. _ $ <br />TOTAL <br />ITEM 13: Furnish all materials, labor, and equipment to install metal <br />coping cap, snap-lok system, 8 -inches wide. <br />A) 24 <br />Gauge Galvanized Steel <br />a) <br />Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />b) <br />Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: - U2 Locations = 90 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />Revised 6/27/18 Page 53 <br />