My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3636
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:22:10 AM
Creation date
3/28/2024 12:41:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3636
Date (mm/dd/yyyy)
03/21/2024
Description
Agreement w/ Advanced Roofing, Inc. for Citywide Emergency Roof Inspection, Maintenance, & Repair Sevices as-needed basis.
Supplemental fields
Expiration Date
3/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 L.F @ $ <br />/L. F. _ $ <br />TOTAL <br />B) 24 Gauge Stainless Steel <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F(&,$ <br />/L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F.- 10,000 S.F. <br />Approximately: Locations = 90 L.F@ $ <br />/E. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 LY @ $ <br />/L. F. = $ <br />TOTAL <br />C) Aluminum with Mnar Finish <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: � Locations = 200 LY @ $ <br />/L. F. _ $ <br />TOTAL <br />ITEM 14: Furnish all materials, labor, and equipment to install pipe <br />mounting pedestals (4), with equipment rail (3 feet x 3 feet), and <br />flashing, 18 inches high. <br />Approximately : *$ /EACH = $ <br />TOTAL <br />ITEM 15: Furnish all materials, labor, and equipment to install pitch <br />pocket, for 6 -inch diameter vertical element. <br />Approximately: (4) *$ /EACH = $ <br />TOTAL <br />ITEM 16: Furnish all materials, labor, and equipment to install pipe or duct <br />mounting roof pedestal, 18 gauge galvanized steel complete <br />with flashing, 12 -inches high. <br />Approximately: (4) *$ /EACH = $ <br />TOTAL <br />Revised 6/27/18 Page 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.