Laserfiche WebLink
BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 L.F @ $ <br />/L. F. _ $ <br />TOTAL <br />B) 24 Gauge Stainless Steel <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F(&,$ <br />/L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F.- 10,000 S.F. <br />Approximately: Locations = 90 L.F@ $ <br />/E. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: (4) Locations = 200 LY @ $ <br />/L. F. = $ <br />TOTAL <br />C) Aluminum with Mnar Finish <br />a) Small Roof Repair Areas: <br />0 S.F. - 500 S.F. <br />Approximately: (2) Locations = 25 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />b) Medium Roof Repair/Replacement areas. <br />501 S.F. -10,000 S.F. <br />Approximately: (2) Locations = 90 L.F@ $ <br />/L. F. _ $ <br />TOTAL <br />c) Large Roof Repair/Replacement Areas: <br />Over 10,001 S.F. <br />Approximately: � Locations = 200 LY @ $ <br />/L. F. _ $ <br />TOTAL <br />ITEM 14: Furnish all materials, labor, and equipment to install pipe <br />mounting pedestals (4), with equipment rail (3 feet x 3 feet), and <br />flashing, 18 inches high. <br />Approximately : *$ /EACH = $ <br />TOTAL <br />ITEM 15: Furnish all materials, labor, and equipment to install pitch <br />pocket, for 6 -inch diameter vertical element. <br />Approximately: (4) *$ /EACH = $ <br />TOTAL <br />ITEM 16: Furnish all materials, labor, and equipment to install pipe or duct <br />mounting roof pedestal, 18 gauge galvanized steel complete <br />with flashing, 12 -inches high. <br />Approximately: (4) *$ /EACH = $ <br />TOTAL <br />Revised 6/27/18 Page 54 <br />