My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2024-3646
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2024
>
Reso 2024-3646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2024 2:40:56 PM
Creation date
4/25/2024 5:03:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2024-3646
Date (mm/dd/yyyy)
04/18/2024
Description
Agreement w/ Paragon Construction Unlimited, Inc. for the interior demolition of property 18050 Collins Ave., and demolition of 18126 Atlantic Ave.
Supplemental fields
Expiration Date
10/31/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. Box 823491, Pembroke <br />CCC#1327336 (954) 430-4309 <br />PROPOSAL <br />Pines, <br />CGC <br />Project Name: 18050 Collins Ave <br />Folio No. 31-2211-037-0001 <br />n I t <br />FL 33082 <br />#042048 <br />Sunny Isles Beach March 19, 2024 <br />18070 Collins Avenue <br />Sunny Isles Beach, FL 33160 <br />Attn: Genesis Cuevas Demolition <br />Paragon Construction agrees to perform the following work at 18050 Collins Ave., Sunny Isles Beach, Old <br />Tony Roma's: <br />The work involved with the project shall include but may not be limited to the furnishing of <br />all labor, materials, tools, equipment, machinery, superintendents, and services necessary for <br />the completion of the project. <br />The work includes demolition and removal of the interior elements of Tony Roma's building. <br />Remove interior walls, but not structural columns. Remove all furniture, remove all <br />flooring. Remove all hoods and leave vents through the roof undisturbed. Remove all <br />ceilings. Leave the bathrooms and fire alarm room. Electrical and mechanical lines are to <br />remain secured to the ceiling. <br />From the exterior remove the steel doors, interior fencing, and bollards from the dumpster <br />area. Remove the walk-in freezer and cooler. <br />The total price for the above is sixty-eight thousand three hundred fifty-seven dollars ($68,357.00). <br />Authorized Signature: 92-6776 Date: 3-19-2024 <br />Acceptance of Proposal <br />Owners Signature: Date: <br />400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.