My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2294
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 3:05:48 PM
Creation date
9/22/2014 1:16:10 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2294
Date (mm/dd/yyyy)
09/18/2014
Description
1st Amd to Agmt w/Craig Smith for Reconstruction of 174th St. Drainage Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING DESIGN & PERMITTING <br />Coordinate with Calvin Giordano on the overlapping of the Roadway and <br />Storm Water improvements on North Bay Road with the proposed bridge. <br />Redesign proposed Roadway and Storm Water improvements and perform <br />associated CAD and permitting changes to accommodate the proposed <br />bridge. Update quantities and cost estimate based on changes required. <br />Fee <br />$9,526.56 <br />TOTAL FEE FOR ADDITIONAL SURVEY & DESIGN SERVICES $15,434.90 <br />trust that we have provided you with the information you need and request that should <br />you have any questions or need any additional information, please do not hesitate to <br />contact me directly. <br />cerelkC.S <br />Stephe, P. E. <br />Vice President <br />Craig A. Smith & Associates <br />Cc: Gene R. Schriner, P.E., CAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.