My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 1:06:34 PM
Creation date
7/31/2024 1:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />18 <br />ITB 24-07-01 INTRACOASTAL SPORTS PARK <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />officers, adequate supervision, and coordination for satisfactory contract performance. When not <br />specifically identified in the technical specifications, such materials and equipment shall be of a <br />suitable type and grade for the purpose and meeting or exceeding all permit or industry standard <br />requirements. All material, workmanship, 100% design, testing and equipment shall be subject <br />to the inspection and approval of the City Manager or his designated representative for this <br />project. <br /> <br />2.17 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police <br />officers, per City regulations and other relevant requirements, shall be provided by the Contractor <br />when work is performed in areas traversed by persons, vehicular traffic or when deemed <br />necessary by the City Manager at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE <br />SUPPORT SHALL BE REQUIRED FOR ALL WORK RESULTING IN MODIFICATIONS TO THE EXISTING <br />TRAFFIC FLOW PATTERNS INCLUDING BUT NOT LIMITED TO LANE CLOSURES AND DETOURS OR <br />WHERE OTHERWISE REQUESTED BY THE CITY. <br /> <br />Contractor shall comply with City, State and Federal regulations and permit requirements for the <br />placement of the proper Traffic Control Devices. Precautions shall be exercised at all times for the <br />protection of persons and property. All services performed under this contract shall conform to <br />all relevant regulations as prescribed in the current edition of the Manual of Uniform Traffic <br />Control Devices (MUTCD), the Florida Department of Transportation’s Design Standards (DS) and <br />OSHA during the course of such effort. Where requirements vary or conflict, the more stringent <br />shall apply. Any fines levied by the above mentioned authorities for failure to comply with these <br />requirements shall be borne solely by the Contractor. <br /> <br />The Contractor is to maintain appropriate signage, guards, and flagmen for the purpose of <br />safeguarding the general public while work is ongoing. All work shall be completed in a safe and <br />workmanlike manner every day and the Contractor shall secure the site prior to leaving at the end <br />of each and every day. <br /> <br />2.18 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br /> <br />If required by City, Contractor shall promptly, as directed and at its sole expense, either correct <br />all defective Work, whether or not fabricated, installed or completed, or, if the Work has been <br />rejected by City, remove it from the site and replace it with non-defective Work. Contractor shall <br />bear all direct, indirect and consequential costs of such correction or removal (including but not <br />limited to fees and charges of engineers, architects, attorneys and other professionals) made <br />necessary thereby. <br /> <br />2.19 CHANGE ORDER <br /> <br /> The Contract may only be changed by a Change Order approved by the City. Any <br /> increase or decrease in the Contract Price or adjustment in the Contract Time shall be based <br /> on written notice by the Contractor delivered promptly to the City (but in no event later than
The URL can be used to link to this page
Your browser does not support the video tag.