My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
INVITATION TO BID 24-07-01 CONSTRUCTION OF INTRACOASTAL SPORTS PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 1:06:34 PM
Creation date
7/31/2024 1:01:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />20 <br />ITB 24-07-01 INTRACOASTAL SPORTS PARK <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.23 FINAL CLEAN-UP <br /> <br />The Contractor shall at all times keep the premises free from accumulation of waste materials or <br />rubbish caused by his employees or the Work. Upon final completion of the Work and before <br />acceptance and final payment shall be made, the Contractor shall clean and remove from the site <br />and adjacent property, all surplus and discarded materials, rubbish, and temporary structures. <br />The Contractor shall restore in an acceptable manner all property which, has been damaged <br />during the execution of the work. The Contractor shall leave the site and vicinity unobstructed in <br />a neat and presentable condition throughout the entire area. <br /> <br />The contractor shall properly dispose, at its own cost, of any waste resulting from the work being <br />performed in an approved facility at an approved site unless otherwise specified in this document. <br /> <br />2.24 E-VERIFY <br /> <br />Florida Statute 448.095 directs all public employers, including municipal governments, to verify <br />the employment eligibility of all new public employees through the U.S. Department of Homeland <br />Security’s E-Verify System, and further provides that a public employer may not enter into a <br />contract unless each party to the contract registers with and uses the E-Verify system. Florida <br />Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, <br />the subcontractor must provide the contractor with an affidavit stating that the subcontractor <br />does not employ, contract with, or subcontract with an unauthorized alien. <br /> <br />In accordance with Florida Statute 448.095, all contractors doing business with the City of Sunny <br />Isles Beach are required to verify employee eligibility using the E-Verify system for all existing and <br />new employees hired by the contractor during the contract term. Further, the contractor must <br />also require and maintain the statutorily required affidavit of its subcontractors. It is the <br />responsibility of the awarded vendor to ensure compliance with E-Verify requirements (as <br />applicable). To enroll in E-Verify, employers should visit the E-Verify website (https://www.e- <br />verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The contractor must, as <br />usual, retain the I-9 Forms for inspection. <br /> <br />2.25 VALUE ENGINEERING <br /> <br />The City is open to any meaningful value engineering that would reduce the overall cost without <br />compromising the integrity. Any innovative idea shall be included in the bid proposal. <br /> <br />2.26 HOURS OF CONSTRUCTION <br /> <br />The Contractor shall minimize the impact of this project on the general public ensuring that all <br />service interruptions are kept to a minimum and providing temporary services, structures, and <br />facilities as required. The existing service to the residents and businesses may not be interrupted <br />for more than 4 hours without written permission from the City. The Contractor shall perform <br />work between the hours 7:00 AM and 7:00 PM Monday through Thursday and 7:00 AM – 5:00
The URL can be used to link to this page
Your browser does not support the video tag.